![Lefroy Brooks BL 1152 Скачать руководство пользователя страница 4](http://html1.mh-extra.com/html/lefroy-brooks/bl-1152/bl-1152_installation-operating-and-maintenance-instructions_1868229004.webp)
3
1
2
4
4
Steps 1-4
Installation Procedure
Lefroy Brooks always recommends that plumbing products be installed by a licensed professional.
Shut off main water supply before installation.
1
Install the stem extension.
2
Install the escutcheons and handles.
3
Install the spout and fix it tightly with set screw.
4
After installing faucet, open the hot and cold supplies to check for leaks.