background image

INSTALLATION INSTRUCTIONS

MODELS:

 VarioContour 0002/0005/0013/0016/0022

(2)

LED Linear

 USA, Inc.  |  

Edition: 30/01/2019

  |  

LED LINEAR RESERVES THE RIGHTS TO CHANGE SPECIFICATIONS WITHOUT NOTICE

ATTENTION

Please read all safety and assembly instructions prior to installation and keep for future reference. 

1. 

Product should be installed by a qualified electrician with regards to all applicable electrical and safety standards.

2. 

Ensure power is shut off at the electrical panel prior to installation in order to prevent electrical shock.

3. 

Use only with SELV (Safety Extra Low Voltage)/Class 2 power supplies. 

4. 

Suitable for installation in Dry Locations. 

5. 

Avoid looking directly into the light source during operation - glare hazard.

6. 

Do not store packed units over 70° F and over 50% humidity more than 12 months.

NOTE

Prior to installation, always test the LED tape with a suitable power supply in order to confirm operation and that the factory 

connections are secure. LED Linear only honors warranty for supplied material and is not liable for installation errors.  

Overview

Preparing the Surface 

Measuring

Thoroughly clean the area where tape lights will be installed. Using a 50/50 

alcohol mix, clean the area where LEDs will be applied and allow time for 

alcohol to dry for 5 minutes.

Align the mounting channel to the determined location. Mark reference 

points to install to the surface. The location of the power supply or wiring 

box should be determined prior to installation. 

1

2

3

50/50

ALC

  

INSTALLATION IN ALUMINUM PROFILE (VarioContour 0002 is illustrated)

  

End caps and mounting channels are 

included with the extrusion order. 

(Models 0002, 0005, 0013, 0016, 0022)

Extend wires to a  wiring 

box or directly to the power 

supply.

Mounting channel is 

installed along the full 

length of the extrusion.

Extrusion mounting channel and lens should be cut 

to size separately. Make sure to match lengths and 

avoid cracking of the lens.

Place extrusions end to end to extend runs. Offset the mounting 

channel to accommodate two extrusions to snap and make 

seamless & secure connection.

Reference mark

Mounting Channel

Extrusion

Lens

Reference mark

Reference mark

Measure and then mark 

the reference points

Отзывы: