
1
2
3
7
1
2
21
21
18
3
19
19
18
18
2
8
9
6
8
9
3
NOTE: Hand tighten bolts and locknuts until machine is fully assembled.
Lock nuts may require additional force to tighten completely.
Assembly
Connect the Main Frame (2) to U Base Frame
(1) and secure it with M10 x 75mm Bolts (21)
and Lock Nuts (18).
1.
2.
3.
Slide Main Upright (3) down onto Main Frame (2)
and secure with M10 x 70mm Bolts (19) and Lock
Nuts (18).
Slide Foam Roller Tube (6) into Main Upright (3).
Place Foam Rollers (8) onto Foam Roller Tube (6)
and secure with Foam Roller Caps (9).