background image

Place the bin over the holes and insert the fixing 
bolts into each hole.

2

Drill 4 x15mm holes in the ground to a depth 
of 100mm to accommodate the bolt length 
and remove debris from holes.

enter 

fax number

Post

Leafield W

ay

Leafield Industrial Estate

Corsham, Wiltshire

SN13 9UD

Telephone

01225 816500

Fax

01225 816501

Email

litter

@leafield-env.com

Website

www

.leafield-environmental.com

1

Marking out holes for ground fixing

5

1

3

2

Position the body in the required location and 
orientation ensuring that the unit is situated on 
a flat level surface.

Using chalk mark the position through the four 
holes in the bin base onto the ground below. 

Move the bin to one side and clearly mark the 
ground in the four hole positions with a cross. 

As the gravel collects in the mouth of the bal-
last filling aperture, lift the top of the unit 90 
degrees allowing the gravel to slide down to the 
base of the unit. Repeat until full. 

Stand the unit back upright.

6

Replace the Cap. Position the body in the required 
location and orientation ensuring that the unit is 
situated on a flat level surface.

4

Ballast filling

Drilling holes and secure into place

Using a 17mm spanner or socket tighten the 
bolts to 22.0Nm torque when fitting the unit 
onto a concrete surface.

3

Отзывы: