STEP:1
7
Assemble the treaded rod (L6) and the U-Clips (L1) as the diagram shown.
STEP:2
Install the cross beams (C) with the treaded
rod (L6) and the U-clips (L1).
8 pieces
4 pieces
L6
L1
middle
top
bottom
Note: Please adjust the distance
between the posts according to
the holes position on the C.