Leading Edge GA-LETU-016 Скачать руководство пользователя страница 19

 

 

 

 

Tel: +44 (0)845 652 0396 

Skyrrid Farm, Pontrilas, Hereford. HR2 0BW. UK 

           www.leturbines.com  

 

 

 Page 19 of 47

 

 

 

 

Maintenance 

 
Please  follow  the  preventive  maintenance  programme  listed  below.  This  will  ensure  that  the 
turbine operates reliably and safely with good efficiency. 
 

Always shut down the turbine before attempting to carry out maintenance. 

 
Post-Installation Checks (to be carried out one month after installation): 

 

Check that the tower mount pins are secure and have not worked loose. Adjust if required. 

 

Ensure that the rotor hub is still securely fitted. 

 

Ensure that the rotor blades rotate freely. 

 

Monitor  the  output.  Ensure  that  the  turbine  and  charge  controller  are  functioning 
correctly. 

 
Annual Maintenance: 

 

Inspect the tower / support structure. 

 

Remove the turbine from its installation to a suitable workbench. 

 

Remove the rotor blade assembly. 

 

Inspect the edges of the rotor blades for damage  such as  dents or chips.  The blades will 
become  unbalanced  if  they  are  damaged.  This  will  cause  vibration,  noise  and  poor 
performance.  If  many  dents  have  occurred  along  the  edges  of  the  blades,  a  new  set  of 
rotor blades should be fitted (part numbers available in the Spares section). 

 

Inspect the roots of the blades (attachment tabs) for signs of stress cracking or fatigue. A 
new  set  of  rotor  blades  should  be  fitted  if  any  cracks  of  fractures  have  occurred  (part 
numbers available in the Spares section). 

 

Remove any build-up of dirt and debris from the rotor blades using a mild detergent and 
warm water. 

 

Check the blade hub fixings for tightness. 

 

Carefully remove the yaw mount bracket by unscrewing the four connection screws from 
the sides of the LE-450 chassis. Inspect the slip rings and wipers for obvious signs of wear. 
Replace the wipers if required (part numbers available in the Spares section). Reassemble 
the yaw pivot carefully (do not to pinch any cables). 

 

Check that all electrical connections are sound and free from corrosion. 

 

Generally  ensure  that  the  turbine  is  in  good  working  condition  and  is  safe  for  continued 
use. 

 
After five years of normal operation: 

 

We  recommend  that  the  rotor  bearings  and  rotor  blades  should  be  replaced  after  five 
years of continuous operation. This will ensure that the turbine’s performance and safety 
is not compromised. 

 
Other Considerations: 

 

The  equipment  used  in  the  charging  system  (batteries,  charge  controller,  PV  panels, 
invertors,  etc.)  should  be  maintained  according  to  the  instructions  published  by  the 
relevant manufacturer. 

 

Where  lead-acid  batteries  are  used,  it  is  especially  important  that  they  are  maintained 
carefully. Failure to do so will result in the batteries being rendered useless within a short 
period of time. 
 

 
 

 
 

 

Содержание GA-LETU-016

Страница 1: ...d Farm Pontrilas Hereford HR2 0BW UK www leturbines com LE 450 Turbine Installation Operation Guide 1m Diameter Micro Wind Turbine for generating clean and renewable electricity anywhere the wind blow...

Страница 2: ...Installation Checks to be carried out one month after installation 19 Annual Maintenance 19 After five years of normal operation 19 Other Considerations 19 Spares 20 Warranty 21 Disclaimer 22 Appendi...

Страница 3: ...ed to the battery separately Ensure the blades are fitted in the correct orientation Consult the diagram on page 9 Blades fitted back to front it will severely impair power production Don t allow the...

Страница 4: ...ser cut aluminium chassis using Yaw wing design to ensure responsive yawing and to reduce weight Maintenance free low friction bearing in both main shaft and yaw assemblies Extremely quiet injection m...

Страница 5: ...nected during the installation procedure Twist the turbine output cables together to create a short circuit during the mechanical installation process This will prevent the turbine from spinning up du...

Страница 6: ...ge 12V 24V 48V DC or Grid tie optimised Rotor Diameter 1000 mm Rated Wind Velocity 8 m s Rated Output 105 Watts Max Output 450 Watts Start up Wind Velocity 2 m s Total weight 8 5 Kg Tower mount 48 3 m...

Страница 7: ...tchet one of each required 8 mm spanner or ratchet A set of Metric Standard Hexagon Keys Electrical screw drivers Power drill 6 5 mm diameter twist drill bit suitable for drilling through steel Digita...

Страница 8: ...tures of 10 degrees Centigrade or lower this bedding in period will be extended by a further 50 hours of normal operation Connect a digital multi meter to the positive red and negative black output le...

Страница 9: ...her is used underneath the anti vibration nuts Three set screws three washers and three anti vibration nuts should be used on each blade Tighten the fixings until the blades are safely secured Do not...

Страница 10: ...he rotor hub in position using the six tapped holes in the drive shaft Ensure that all screws are securely tightened and that the rotor blades are fitted with the flat side of the blade facing forward...

Страница 11: ...e purchased a LE 450 mount bracket or tower from a Leading Edge Turbines dealer then please refer to the separate installation instructions supplied with the product If you have sourced your own tower...

Страница 12: ...ss sectional area is used heat will build up in the cables causing a potential fire hazard Cable capacities quoted below are based upon Tri Rated cables BS6231 Transmission Distance LE 450 Nominal Out...

Страница 13: ...ower from the turbine Clip the cables to the inside of the tower Failure to do this will result in excessive mechanical strain on the cable joints within the slip ring assembly and may cause a failure...

Страница 14: ...ed in parallel with the battery bank see Fig 13 The Tristar diversion charge controller can then be configured to regulate at a slightly higher voltage than the PV charge controller This will prevent...

Страница 15: ...AMMETER OPTIONAL FUSE OR BREAKER RECOMMENDED BATTERY DISCONNECT OPTIONAL TRISTAR DIVERSION CONTROLLER REQUIRED BATTERY BANK WIRED TO APPROPRIATE CAPACITY VOLTAGE TOWER OR SUPPORT STRUCTURE SEE RUN ST...

Страница 16: ...be used in conjunction with shore power and engine alternator power sources A LE 450 TURBINE PN GA LETU 016 RUN STOP SWITCH BOX REQUIRED PN GA CTRL 008A AMMETER OPTIONAL FUSE OR BREAKER RECOMMENDED BA...

Страница 17: ...al for specific operational instructions Shut Down By activating the stop switch the output from cables of the turbine are shorted together This effectively puts an infinite load on the generator caus...

Страница 18: ...ne to run off load with no connection to a battery bank or grid tie inverter Doing so will allow open circuit voltages to be generated by the turbine These voltages may be dangerous and may damage the...

Страница 19: ...of stress cracking or fatigue A new set of rotor blades should be fitted if any cracks of fractures have occurred part numbers available in the Spares section Remove any build up of dirt and debris fr...

Страница 20: ...t Leading Edge Turbines Dealer and quote the part numbers listed below Rotor Blade set of 5 DP LETU 145 X5 Magnet Rotor SA LETU 031 Stator 12V 24V 48V SA LETU 027 Yaw pivot Slip ring module SA LETU 01...

Страница 21: ...ign will void the warranty and may compromise the safety of the machine What is not covered by your warranty Damage caused by unsatisfactory installation of the turbine tower and or control equipment...

Страница 22: ...of the chassis Disclaimer All specifications are subject to change without prior notice The information given in this user manual is believed to be accurate and reliable Leading Edge Turbines assumes...

Страница 23: ...Tel 44 0 845 652 0396 Skyrrid Farm Pontrilas Hereford HR2 0BW UK www leturbines com Page 23 of 47 Appendix 1 Tristar 45 Diversion Charge Controller...

Страница 24: ...en performing routine inspection or maintenance always stop the turbine by activating the stop switch Electrical Safety Hazards The Tristar controller and dump load operates with low voltage DC Even a...

Страница 25: ...e common sense when installing and operating your turbine and Charge Controller Electrical Installation Please refer to the overall electrical schematic in the turbine installation for appropriate gen...

Страница 26: ...Tel 44 0 845 652 0396 Skyrrid Farm Pontrilas Hereford HR2 0BW UK www leturbines com Page 26 of 47...

Страница 27: ...Tel 44 0 845 652 0396 Skyrrid Farm Pontrilas Hereford HR2 0BW UK www leturbines com Page 27 of 47...

Страница 28: ...Tel 44 0 845 652 0396 Skyrrid Farm Pontrilas Hereford HR2 0BW UK www leturbines com Page 28 of 47...

Страница 29: ...Tel 44 0 845 652 0396 Skyrrid Farm Pontrilas Hereford HR2 0BW UK www leturbines com Page 29 of 47...

Страница 30: ...Tel 44 0 845 652 0396 Skyrrid Farm Pontrilas Hereford HR2 0BW UK www leturbines com Page 30 of 47...

Страница 31: ...Tel 44 0 845 652 0396 Skyrrid Farm Pontrilas Hereford HR2 0BW UK www leturbines com Page 31 of 47...

Страница 32: ...Tel 44 0 845 652 0396 Skyrrid Farm Pontrilas Hereford HR2 0BW UK www leturbines com Page 32 of 47...

Страница 33: ...Tel 44 0 845 652 0396 Skyrrid Farm Pontrilas Hereford HR2 0BW UK www leturbines com Page 33 of 47...

Страница 34: ...Tel 44 0 845 652 0396 Skyrrid Farm Pontrilas Hereford HR2 0BW UK www leturbines com Page 34 of 47...

Страница 35: ...Tel 44 0 845 652 0396 Skyrrid Farm Pontrilas Hereford HR2 0BW UK www leturbines com Page 35 of 47...

Страница 36: ...Tel 44 0 845 652 0396 Skyrrid Farm Pontrilas Hereford HR2 0BW UK www leturbines com Page 36 of 47...

Страница 37: ...Tel 44 0 845 652 0396 Skyrrid Farm Pontrilas Hereford HR2 0BW UK www leturbines com Page 37 of 47...

Страница 38: ...Tel 44 0 845 652 0396 Skyrrid Farm Pontrilas Hereford HR2 0BW UK www leturbines com Page 38 of 47...

Страница 39: ...Tel 44 0 845 652 0396 Skyrrid Farm Pontrilas Hereford HR2 0BW UK www leturbines com Page 39 of 47 Appendix 2 Run Stop Switch User Manual Only operate in light winds...

Страница 40: ...ition The turbine is dynamically braked and may be seen to rotate very slowly Position 2 Turbine Run position The turbine output is allowed to flow straight through the switch to the relevant output S...

Страница 41: ...per these instructions and wiring schematics Incorrect wiring may lead to a short circuit being placed across the batteries which can lead to fire or explosion Please use common sense when installing...

Страница 42: ...Tel 44 0 845 652 0396 Skyrrid Farm Pontrilas Hereford HR2 0BW UK www leturbines com Page 42 of 47 Appendix 3 System Trouble Shooting...

Страница 43: ...f a fuse or circuit breaker has been fitted to the turbine ensure that this is correctly closing the circuit Never leave the turbine running in an off load state as it may cause damage to the turbine...

Страница 44: ...ure that you have the correct voltage turbine for your application Issue A slight oscillation can be observed in the turbine tail fin whilst the turbine is rotating at certain speeds Potential Causes...

Страница 45: ...ce in the alternator coils dramatically increases which causes the alternator efficiency to drop drastically This effects the overall output of the turbine Performance will drop after the turbine has...

Страница 46: ...s and buildings Excessive turbulence will hamper the performance of your turbine Small wind turbines operate best in steady airflows Free flowing airstreams are more consistent in direction and wind s...

Страница 47: ......

Отзывы: