![LDM RV 102 Скачать руководство пользователя страница 2](http://html.mh-extra.com/html/ldm/rv-102/rv-102_instruction-for-installation-and-maintenance_1864290002.webp)
2.
DIRECTIONS FOR INSTALLATION
2.
The valves are delivered from the company assembled, adjusted and tested. Before valve
´
s installation into
pipiline you must check the data on the name-plate with data mentioned in accompanying documentation.
Then check if the valve or the actuator are not damaged and dirty. Pay attention especially to inner spaces and
packing surfaces of valve.
2.2 Dimensions and weights of valves RV 10x
1 Preparation before installation
RV 102
D -with actuators Siemens and
L,B
Belimo
D -with actuators Sauter
S
D -with actuators Johnson Controls
C
D
-with actuators Honeywell,
H,E
and ZPA Nová Paka
H - with actuators Siemens, J.Controls,
Honeywell, Belimo, and
ZPA Nová Paka
H -with actuators Sauter
S
RV 102
RV103
DN
L
1
V
2
V
1
H
H
S
D
L,B
D
S
D
C
D
H,E
m
mm mm
mm
mm
mm mm mm mm mm mm kg
15
20
25
32
40
50
85
95
105
120
130
150
27
32
41
50
58
70
43
48
53
66
70
80
10 10
16 14
8
M6
M 8x1
0.55
0.65
0.80
1.40
2.00
2.95
1/4´´UNF
C
G 1/2
G
3/4
G 1
G 1 1/4
G 1 1/2
G 2
L
1
L
2
L
3
9
11
12
14
16
18
mm
12
14
16
18
20
22
S
mm
25
25
25
35
35
42
DN D
1
D
2
D
3
nxd
a
f
L
1
V
1
V
2
H
H
S
D
L,B
D
S
D
C
D
H,E
m
mm mm mm
mm
mm mm mm mm mm mm mm mm mm mm mm kg
15
20
25
32
40
50
95
105
115
140
150
165
65
75
85
100
110
125
45
58
68
78
88
102
4 x 14
4 x 18
16
18
20
2
3
130
150
160
180
200
230
65
75
80
90
100
115
25
25
25
35
35
42
10 10
16 14
8
M6
M 8x1
3.2
4.3
5.5
7.7
8.5
11.9
1/4´´NF
RV 103
MIX. 2-cest.
m
kg
4.0
5.4
6.8
9.7
10.9
15.6
PM - 009/12/01/GB _ RV 102, 103 2/6