LCUT Creative B 00-34 OO Скачать руководство пользователя страница 3

PAGE 3 OUT OF 4 

Use the 3 diagrams above to position the 
raised woodwork elements over the signal 
box front and back elevations. Not the ele-
ment B needs to be cut along the scored 
lines to fit in place. 

If assembling the roof separate 
(removable) glue the LCC 03-94 supports 
to the roof tile panels LCC 03-92. Other-
wise glue them to the signal box body. 
The barge boards LCC 03-91 should be 
glued to the roof tile panels about flush 
with the cut out in the top edge of the roof 
tile panel. They also should not be touch-
ing the signal box body. Use the provided 
LCC 00-09 roof tile strips to complete the 
roof. 

The balcony can be assembled 
either in the full version or in the 
front wall version only. Glue the 
supports from LCC 03-88 to the 
bottom of the balconies. Mind the 
cut outs in the balcony so that it 
clears the raised woodwork and 
sits flush on the signal box front 
wall. Glue the balcony to the sig-
nal box one plank below the win-
dows (the supports should clear 
the raised woodwork). 

Отзывы: