
PAGE 3 OUT OF 4
Use the 3 diagrams above to position the
raised woodwork elements over the signal
box front and back elevations. Not the ele-
ment B needs to be cut along the scored
lines to fit in place.
If assembling the roof separate
(removable) glue the LCC 03-94 supports
to the roof tile panels LCC 03-92. Other-
wise glue them to the signal box body.
The barge boards LCC 03-91 should be
glued to the roof tile panels about flush
with the cut out in the top edge of the roof
tile panel. They also should not be touch-
ing the signal box body. Use the provided
LCC 00-09 roof tile strips to complete the
roof.
The balcony can be assembled
either in the full version or in the
front wall version only. Glue the
supports from LCC 03-88 to the
bottom of the balconies. Mind the
cut outs in the balcony so that it
clears the raised woodwork and
sits flush on the signal box front
wall. Glue the balcony to the sig-
nal box one plank below the win-
dows (the supports should clear
the raised woodwork).