background image

1

Thanks for choosing LCEQ products, please carefully read this manual book before using the

hopper dryer. For any query, please contact us.

Zhongshan LCEQ Plastics Technology Co., Ltd

No. 7 Taichang Road, Xiaolan Town, Zhongshan City, Guangdong Province, China
Email:

[email protected]

Tel/Whatsapp: +86 186 8018 7008
Website: https://www.zslceq.com

1. Installation

Drill holes on standard base of hopper dryer according to the installation diameter of hopper opening of
injection molding machine, and place it vertically on the hopper opening and fix it by tightening the screws.
Notes: When drilling, the holes diameter is the installation diameter of the hopper’s opening on the plastic
injecting molding machine and must tighten with the screws before use

1.1 On Injection Molding Machine

Отзывы: