
Operating Instructions – LBAT10/20/PMR – Version 2017
20
7.1.2
LBAT 20/PMR:
Construct a 3370 x 1500 x 200 concrete foundation to install the turnstile according to the following
recommendations.
The slab must be perfectly horizontal and placed at least at finished ground level.
We will only cover the LBAT 10 turnstile below. The various procedures are the same
for the LBAT 20 and LBAT PMR turnstiles.
Casing for access control
Casing for access control
Содержание LBAT10
Страница 12: ...Operating Instructions LBAT10 20 PMR Version 2017 12 4 1 2 LBAT 20 FRONT VIEW SIDE VIEW TOP VIEW ...
Страница 41: ...Operating Instructions LBAT10 20 PMR Version 2017 41 14 Wiring diagram ...
Страница 42: ...Operating Instructions LBAT10 20 PMR Version 2017 42 ...
Страница 43: ...Operating Instructions LBAT10 20 PMR Version 2017 43 ...
Страница 45: ...Operating Instructions LBAT10 20 PMR Version 2017 45 ...