
“E
SPRESSO
P
OINT MOD
. M
ATINÈE
230 V”
C
OD
. 83192 / R
EL
. 2.00 / J
ANUARY
2003
1
5/6
General information
List of tools necessary for maintenance
To carry out maintenance on the “Espresso Point” the following tools are necessary.
This list is purely indicative, and does not take into account the availability on some
markets of alternative or additional tools of greater efficiency.
1
Open ended 8 - 9 mm. spanner
2
Open ended 10 - 11 mm. spanner
3
Open ended 12 - 13 mm. spanner
4
Standard pliers
5
PH2 Prehensile cross-headed screwdriver
6
4mm Hexagon head cap spanner
7
Narrow-bladed screwdriver
8
Small cross-headed screwdriver
9
Socket spanner Ø 5,5 - 25 mm
Warning !
All the mechanical connections, apart from those on the pump, use safety fastons to
prevent unthreading.
Where fastons are fitted with caps, press the plastic as shown in the figure and then
pull.
Содержание MATINEE 230V
Страница 10: ......
Страница 13: ...ESPRESSO POINT MOD MATIN E 230 V COD 83192 REL 2 00 JANUARY 2003 230 V 2 1 2 2 Technical information...
Страница 16: ......
Страница 30: ...ESPRESSO POINT MOD MATIN E 230 V COD 83192 REL 2 00 JANUARY 2003 Page left intentionally blank...