![background image](http://html1.mh-extra.com/html/laundry-jet/isense/isense_installation-manual_4577621022.webp)
+1.800.867.4580 [email protected] www.laundryjet.com
22
Lift Port Installation
6.2
Step 2 - Lift Port Sheetrock Template
Sheetrock Template
▪
Install sheetrock over the Port 90 and Port Mount Brackets
▪
Trim around outside edge of the Port 90 and remove material
▪
Cut the Port 90 so that it is flush with the sheetrock.
▪
Remove the section for Lift ports from the Sheetrock Template
▪
Position the round portion on the back of the template into the Port 90
▪
Using a level use the top horizontal edge to level the template
▪
Trace around the inside of the 1" diameter hole in the template
▪
Using a 1" hole saw, cut a hole through the sheetrock