Initial Set-Up
Gearbox
3
3-8
Lastec//021819
Initial Set-Up
8.
The Bondoli PTO shaft should maintain a minimum engagement of 1/3 of the total com-
pressed shaft length.
9.
If the Bondoli PTO shaft maintains at least 1/3 shaft engagement, you will be operating
within the proper range of the shaft.
10.
If the Bondoli PTO shaft does not maintain at least 1/3 shaft engagement, you will not be
operating within the proper range of the PTO. You will need to either install a longer PTO
shaft, or avoid this area when cutting.
11.
If installing a longer PTO shaft, re-check your maximum PTO shaft compression.
3.5
Gearbox
Check the oil level and condition in the gearbox. The oil level should be 1/4” to 3/8” below
the bottom edge of the side plug. The gearbox should be approximately half full (28
ounces). Add oil if low. If the oil appears excessively contaminated, change the oil. Use
SAE 80W-90 grade gear oil.
Inspect the entire area around and under the gearbox for any oil leakage. If a leak is dis-
covered, repair it and refill the gearbox before operating the Articulator.
Содержание 721XRT
Страница 1: ...Lastec Articulator Model 721XRT Owner s Manual Manual Part Man 721XRT ...
Страница 5: ...Lastec 021819 1 1 1 SECTION 1 TO THE OWNER ...
Страница 12: ......
Страница 13: ...Safety Information Safety Information Lastec 021819 2 1 2 SECTION 2 SAFETY INFORMATION ...
Страница 25: ...Lastec 021819 3 1 3 SECTION 3 INITIAL SET UP ...
Страница 42: ......
Страница 43: ...Lastec 021819 4 1 4 SECTION 4 OPERATING PROCEDURES ...
Страница 51: ...Lastec 021819 5 1 5 SECTION 5 MAINTENANCE ...