
ENGLISH
20
J8-J9:
use for the
SECOND
engine stop.Locate supply to coil,fuel pump or electronic
ignition module.Cut this wire. Connect
J9
to the supply side of the cut wire and connect
J8
to the load side of the cut wire. Solder and insulate joints carefully.
J7:
connect to a quality ground.
DO NOT REVERSE CONNECTION POINTS OF J9 AND J8.
DAMAGE WILL RESULT.
J1-J2:
use for the
FIRST
engine stop. Locate supply to starter solenoid or crank relay.
Cut this wire.Connect
J2
to the supply side of the cut wire and connect
J1
to the load
side of the cut wire. Solder and insulate joints carefully.
J3:
connect to a quality ground.
DO NOT REVERSE CONNECTION POINTS OF J1 AND J2.
DAMAGE WILL RESULT.
DIAGRAM 2
STOP ENGINE CONNECTIONS
J2
J1
STARTER
SOLENOID
IGNITION
KEY
J3
MAIN GROUND
J9
J8
FUEL PUMP
O
ELECTRONIC
IGNITION
IGNITION
KEY
J7
MAIN GROUND
Is996v2 ita-ing.pm6
05/03/98, 16.27
20