4
5.
PUNCH
AND
DIE
CHANGE
WARNING!
Before
mounting
the
punch
and
die
and
starting
work,
check
that
the
punch
and
die
Dimensions
match.
If
this
is
not
the
case,
the
tool
could
be
seriously
damaged.
Order
of
procedure:
1.
When
mounting
the
punch
and
die:
First,
mount
the
punch
and
then
insert
the
die.
2.
When
replacing
the
punch
and
die:
First,
remove
the
die
and
then
remove
the
punch.
Procedure
Loosen
the
hexagonal
slotted
nut
(no.
9)
and
remove
it
completely.
Insert
the
punch
and
secure
firmly
with
the
hexagonal
spanner
supplied
with
the
tool.
To
mount
the
die,
loose
the
die
stud
(no.
3)
and
insert
the
die
in
the
holder
and
secure
firmly
with
the
stud.
It
is
important
that
you
firmly
tighten
the
die
stud
since
this
stud
ensures
that
the
punch
is
centred.
To
remove
the
punch
and
die,
loose
the
stud
(no.
3)
securing
the
die
and
remove
the
die.
Loose
the
hexagonal
slotted
nut
(no.
9)
and
remove
completely
,
then
take
out
the
die.
Regularly
grease
the
punch
and
die
DIE
HOLDER
PUNCH
HEXAGONAL
NUT
DIE
STUD
DIE
Содержание PH035
Страница 7: ...7 DECLARATION OF CONFORMITY ...