background image

3

30200

Before installation :

INSTALLATION

1.

 

2.

 Once you have assembled the product plate (final step of the assembly instruction on page ‘Installation manual’ 

of the logbook) the installation is finished. You can begin to clean up the building site.

Prepare and fence area for installation. 

INSTALLATION - DRILLING

1.

 Larch wood is a hard wood and that means that you need to drill screws slower than for example in pine wood. 

2.

 The screws don´t hold for the fastest speed on drilling machine. 

INSTALLATION - FOUNDATIONS

1.

 Later in installation manual we are showing how the product could be installed in ground. If no concrete is 

needed you need to pack the material in the hole so it´s packed in a good way around the foundation. 

2.

 It´s always the installers responsibility that the product is totally solid in ground. 

3.

 If the material in the ground is unstable, concrete may be needed sometimes.

ENTRAPMENTS

1. 

When the device is installed, check the all dimensions match and check that you have avoided dimensions that 

are dangerous for the child:

Dimensions dangerous for the 

Entrapment

Small finger and large finger

45 mm

Neck

Torso, small head, large head

CHECKS

1. 

After installation on the device, daily or weekly functional checks should take place depending in the intensity

of use - by a trained employee and functional quarterly and international controls - by playground inspector. 

QUESTIONS

1. 

If this is your first time to install a unit from us you should read installation manual very carefully. 

2. 

If you have any doubts, please call us so we can guide you before trying to much. 

Содержание TRESS MODERN NATURE

Страница 1: ...ight 306 cm Safety zone 895x753 cm Platform height 120 cm Critical Falling Height 120 cm Requires falling surface YES Spare parts available YES Acc to EN 1176 YES Age level 3 years 30200 1 MODERN NATU...

Страница 2: ...F3 M8x70 G B8x75 B8x65 G1 B6x50 G2 B6x30 G3 P P1 Threaded rod nut M 15x28 L1 L2 L3 M10x40 Before installation 3 On first page with Step by step at logbook you can see the step by step installation of...

Страница 3: ...a good way around the foundation 2 It s always the installers responsibility that the product is totally solid in ground 3 If the material in the ground is unstable concrete may be needed sometimes EN...

Страница 4: ...Product main dimensions 3 MODERN NATURE 30200 cm H DEPENDING ON OPTION STEEL 57 cm or 77 cm WOOD 57 cm or 87 cm Special foundations will be described...

Страница 5: ...ATURE INSTALLATION STEP BY STEP 1 HFb to CB h120 6xP220 2 F90 h120 4xP270 3 R90 4 CB180 5 SL120 6 HL120 7 WR MN90 8 NL120 9 BS90 GROUND LEVEL PLATE PRODUCT PLATE DEPENDING ON OPTION METAL WOOD 10x FOU...

Страница 6: ...Saw if necessary Pre drill before screw Hole in wood for screw one size smaller than screw Hole in wood for bolt one size bigger than bolt Hole in plastic the same size as screw Concreted Grind surfa...

Страница 7: ...cm HFb to CB height Installation manual F8x80 W8 F6x50 W6 F6x50 W6 N2 B A N1 CB h CB 0...

Страница 8: ...cm P height Installation manual 1 2 1 3 2 3 4...

Страница 9: ...cm P height Installation manual 2 2 h 3 0 57 87 0 0 57 77 3 0 0 A N1...

Страница 10: ...Installation manual cm F module height m m 150 h B N2...

Страница 11: ...Installation manual cm R module...

Страница 12: ...0 cm CB length Installation manual...

Страница 13: ...cm SL height Installation manual B N2 7 5 210 180 150 120 90 55 10 35 0 20 90 0 1 5 7 5 N1 A D 87 210 180 150 120 90 55 G1 G1 N2 L1 L1 N2 4x D h h...

Страница 14: ...71 5x D cm HL CP height Installation manual...

Страница 15: ...cm WR MN module Installation manual...

Страница 16: ...cm NL LB height Installation manual 71 cm 210 0 180 150 120 90 120 103 86 69 52 5x D...

Страница 17: ...cm BS90 Installation manual...

Страница 18: ...Installation manual cm...

Отзывы: