![Larius Zeus Скачать руководство пользователя страница 14](http://html2.mh-extra.com/html/larius/zeus/zeus_operating-and-maintenance-instruction-manual_3699172014.webp)
ZEUS
12
MIN
MAX
English
•
Lift the suction unit and immerse it in the bucket that contains
the washing liquid.
•
Connect the clamp to an earthing point.
CONNECTION OF THE TOOLING TO THE POWER SUPPLY
Before connection up the power supply to the
equipment, make sure that the electrical system
is earthed and complies with regulations.
Make sure that the clamp (F4) provided is positio-
ned correctly, in order to earth the pump unit in
the equipment properly.
•
Ensure the gun (
F3
) is without nozzle.
•
Check the switch (
F5
) is on the “
OFF”
(0)
position before
connecting the cable to the mains.
•
Place the pressure control knob (
F6
) on the “
MIN
” position
(turn counterclockwise)
.
WASHING OF THE NEW EQUIPMENT
•
The equipment has already been adjusted at our factory with
light mineral oil left inside the pumping group as protection.
Therefore, wash with diluent before sucking the product.
• Press the switch (
F5
) of the equipment “
ON”
(I)
.
F5
F6
OFF
F3
F5
ON
PRESSIONE
PRESSURE