8
THOR
English
ALARM MESSAGE TABLE
Cause
Type of alarm
Alarm symbol
F1
F2
F3
F4
F5
F6
F7
F8
Maximum.current
Dissipator.temp.
Motor.temp.
Maximum.voltage
Minimum.voltage
Earth.connection
Pressure.sensor.missing
Automatic.switch-off.during.circulation.
phase.(15.minutes)
The. motor’s. current. absorption. is. too.
high
The.dissipator.temperature.is.too.high
The.motor.temperature.is.too.high
The.voltage.is.too.high
The.voltage.is.too.low
The. earth. connection. is. disconnected.
or.non-existent
The. pressure. sensor. is. damaged. or.
not.fitted
The.equipment.is.in.cleaning.mode
Check. the. mechanical. and. hydraulic.
condition.of.the.equipment...If.necessary,.
take.action
Check.that.the.dissipator.surfaces.are.
clean.and.that.the.dissipator.is.properly.
ventilated
Check.that.the.motor’s.heat.dissipation.
surfaces.are.clean...Check.that.cooling.
ventilation.is.correct
Check. the. connection. to. the. electrical.
line. and. reinstate. the. correct. nominal.
voltage
Check. the. connection. to. the. electrical.
line. and. reinstate. the. correct. nominal.
voltage
Check.the.earth.cable.and,.if.necessary,.
replace.it..Make.sure.that.the.machine.
is.earthed
Replace.it
Wait. until. the. equipment. has. stopped.
completely.before.using.it.for.a.new.job
Solution
D
TRANSPORT AND UNPACKING
•.. The.packed.parts.should.be.handled.as.indicated.in.the.
symbols.and.markings.on.the.outside.of.the.packing.
•.
Before.installing.the.equipment,.ensure.that.the.area.to.
be.used.is.large.enough.for.such.purposes,.is.properly.lit.
and.has.a.clean,.smooth.floor.surface.
•.. Check.the.packing.is.undamaged.on.receipt.of.the.equi-
pment..Unpack.the.machine.and.verify.if.there.has.been.
any.damage.due.to.transportation.
.
In. case. of. damage,. call. immediately.
LARIUS
. and. the.
Shipping.Agent..
.
All.the.notices.about.possible.damage.or.anomalies.must.
arrive.timely.within.8.days.at.least.from.the.date.of.receipt.
of. the. plant. through. Registered. Letter. to. the. Shipping.
Agent.and.to.
LARIUS
.
The.user.is.responsible.for.the.operations.of.unloa-
ding.and.handling.and.should.use.the.maximum.
care.so.as.not.to.damage.the.individual.parts.or.
injure.anyone.
To. perform. the. unloading. operation,. use. only.
qualified.and.trained.personnel.
(truck and crane
operators, etc.)
.and.also.suitable.hoisting.equipment.
for.the.weight.of.the.installation.or.its.parts..Follow.
carefully.all.the.safety.rules..
The.personnel.must.be.equipped.with.the.necessary.
safety.clothing.
The.disposal.of.packaging.materials.is.a.customer’s.
competence.and.must.be.performed.in.accordance.
with.the.regulations.in.force.in.the.country.where.
the.plant.is.installed.and.used..
It.is.nevertheless.sound.practice.to.recycle.packa-
ging.materials.in.an.environment-friendly.manner.
as.much.as.possible.
•.. The.manufacturer.will.not.be.responsible.for.the.unloading.
operations.and.transport.to.the.workplace.of.the.machi-
ne.
Содержание THOR
Страница 53: ...THOR FIELDS OF APPLICATION ...