Jona Slim-V 90 X3
|
Asennus- ja käyttöohje/Installation and user manual/Monterings och bruksanvisning
16
EN
INSTALLER SIGNED PRODUCT TEST DOCUMENT
During installation, the installer must must check the checklist below. Please note that the first checkpoints take place before the actual
installation. By signing the document, the installer ensures the installation has been carried out in accordance with the installation instructions
and that the appliance is functioning properly and is flawless.
■
In case any of the checkpoints 1) to 6) above are not in order, the installer must immediately contact the seller/customer
as well as Lapetek service at +358 9 2511 030 for further information.
■
In case checkpoint 2) is not in order, the installer must contact property maintenance about the problem in the chimney.
■
The warranty granted by Lapetek is conditional on the completion of this document and the certification of the condition
of the checkpoints. A copy of the test document must be submitted with a product reclamation.
Installer’s signature
Clarification of the installer’s name
Company name
Date and place
Before installation:
1.
The appliance is externally in good condition when removed from packaging and includes all its parts.
The appliance has no imperfections/visible defects/color defects/bumps/scratches/etc.
After installation:
2.
Check that the suction power is perfect after installation. In case the suction power is poor after installation,
Check that external motor works properly and there is nothing in the piping causing decrease of the air flow.
3.
Flow control damper opens/closes.
4.
Lights are working.
5.
Power control of the lights are lights are working.
6.
The device is set to X3 .
LAITTEEN TESTAUSPÖYTÄKIRJA
PRODUCT TEST DOCUMENT
PRODUKTENS GRANSKNINGSPROTOKOL