LANSING LIGHTING JCL50 Скачать руководство пользователя страница 4

Shanghai Lansing Electronics Co., Ltd

Tel : +86 021 39921107

Fax:+86 021 39921107

Web:www.lansinglight.com E-mail:[email protected]

Add: No 609, Tahui Rd, Shihudang Town, Songjiang Dist Shanghai, China, 201612

All rights reserved by Lansing,without the written authorization of the Lansing, any part thereof shall not be reproduced or transmitted in any form.

JCL50 LED Portable Solar Runway(Taxiway) Light

4 / 6

Operation and set up:

Designed to be almost maintenance-free, the JCL50 requires minimal attention, though the following maintenance and

servicing information is provided to help ensure the life of your Lansing product.

1.Cleaning Solar Panels - occasional cleaning of the solar panels may be required. Using a cloth and warm soapy water,
wipe off any foreign matter before rinsing the panels with fresh water.

2.Battery Check - inspection of batteries should be performed every three years (minimum) to ensure that the charger,
battery and ancillary electronics are functioning correctly. Using a voltage meter, check that the battery voltage is at least
12 volts under 100mA load, and ensure all terminals are clear of foreign matter.

3.O-Ring Check - inspect the condition of the O-ring for damage, wear or if it is brittle, and replace if necessary. The O-ring
should be a rubber texture to ensure a complete and even seal.

JCL50 Long Term Battery Storage & Maintenance

If the JCL50 is to be placed in storage for an extended period please follow the below information. The batteries inside the
lights must always be stored in a fully charged state.

Always make sure the ON/OFF switch is in the OFF position.

All batteries will discharge over time and the rate of discharge is dependent on temperature. If the light is being stored in
temperatures greater than 40°C the battery will discharge faster.

The JCL50 is fitted with a charge port that can be used to charge the battery and test the battery voltage. Please check the
battery regularly and recharge if necessary. Charge the battery via the external charging port on the base of the unit. Only
attach the plug with your hand, do not use multi- grips to attach the plug.

Turn the ON/OFF switch to the ON position and place unit in the sun for 2-4 days.

NOTICE:

Care must be taken to observe the polarity of each wire before they are connected. To ensure waterproofing of the unit,
make sure that there is a satisfactory seal.

Installing the Light Head Assembly on the Solar Unit

After servicing, it will be necessary to reinstall the light head on the solar unit.

1.Connect the 4 bullet connectors

2.Ensure the O-ring seal on the top of the solar chassis is in place, clean and lightly greased

3. Feed the wires into the corner of the solar unit

Содержание JCL50

Страница 1: ... corners provide additional impact resistance The advanced light optic uses a high power LED The tough polycarbonate light lens is specifically designed for use with LEDs to maximize light intensity and uniformity The light optic is interchangeable between units and can be replaced onsite in the unlikely event of damage The light can also be fitted with an optional external charging port for charg...

Страница 2: ...h Lighting System Specifications LIGHT OUT PUT Intensity 50cd LED Color Available Red Yellow Green white blue optional Vertical Divergence 10 Degree Horizontal Out put 360 Degree Illumination Ultra bright LEDs or NVG compatible infrared IR LEDs LED Lifespan 100 000 Hours OPERATION Autonomy 25 days flashing 8 days steady burning Flash Pattern Steady and Flashing can adjusted 20 60times min POWER SU...

Страница 3: ...enching No airfield interruptions Just place the JCL50 and it emits light dusk to dawn while maintaining its battery Low Maintenance The JCL50 integrates solar panels battery electronics and LED light source into a compact stand alone unit requiring minimal maintenance for 5 years Reliable The Energy Management System EMS monitors all operations to provide consistent output in the harshest environ...

Страница 4: ...ry The O ring should be a rubber texture to ensure a complete and even seal JCL50 Long Term Battery Storage Maintenance If the JCL50 is to be placed in storage for an extended period please follow the below information The batteries inside the lights must always be stored in a fully charged state Always make sure the ON OFF switch is in the OFF position All batteries will discharge over time and t...

Страница 5: ...ttery compartment which provides the user with the ability to change the battery after years of operation 1 Turn the unit on its side 2 Remove the four M6 x 25mm screws from the body base section 3 Place the unit back upright while still holding onto the base 4 Slide the chassis upwards just enough to expose the battery wiring loom terminals 5 Disconnect the battery wiring loom terminals 6 Slide t...

Страница 6: ...y occur and there is a risk of fire Do not use different types of batteries in the same battery assembly Sealed lithium battery and NiMH do not mix If the battery has been deep discharged a prolonged charging time is required to bring the battery back to full capacity Handling Do not incinerate or dismantle batteries Cell components are corrosive and may be harmful to skin and eyes Do not pull on ...

Отзывы: