
56
9.
For the rear rack installation, slide
the rail to aim and engage the bolts
on the rail’s rear end with the two
available holes on the post, and the
rail assembly will click into place.
10.
Stretch both of the Inner Rails out
to their fullest extent. You will
hear a click sound when they are
fully stretched and locked.
11.
Hold the system with its front
facing you, lift the chassis and
gently engage the brackets on
the system while aligning them
with the Inner Rails as shown in
the image, and then push the
system into the cabinet.
The Inner Rail will click
when it is fully stretched.
Click
Click
Содержание uCPE NCA-4020
Страница 77: ...NCA 4020 User Manual 77 Super IO Configuration...
Страница 100: ...100 Server ME Configuration...
Страница 105: ...NCA 4020 User Manual 105 Per Socket Configuration Feature Options Description CPU Socket0 Configuration None None...
Страница 120: ...120 View System Event Log...
Страница 128: ...128 APPENDIX B IEEE 802 1Q VLAN TAG APPLICATION NOTE Sample Diagram...