background image

Section E  

Perpendicular beam 

installation 

Hint:  

It may be easier to put in the screws  when the wheels 

are removed  

If your beams run 

perpendicular to your 

garage door you need 

to run your 2x6 piece 

differently 
1. Cut your 2x6 

approximately 50 

inches long.  

2. With the provided 

hardware attach 

both single pulleys 

on the 2x6 34 

inches from each 

other. Make the 

first pulley on 

center and the 

second pulley ½ 

inch left of center. 

This will allow the 

cables to run next 

to each other 

without 

interference. 

3. Mount the double 

pulley on a 20 inch 

2x6. You can 

mount your double 

pulley on the 

celling or at the 

top of the wall. 

Attach your 2x6 to 

three studs in line 

with the double 

pulley in the 

corner of the wall.  

4. Proceed to section 

C.  

Call toll free  1-866-284-7428  

Langeoriginals.com  

Copyright Lange Originals  

34 inches  

Mount  third pulley (strap pulley)  ½ inch left of center  

Middle pulley (hook) 

Содержание Hoist-A-Top Simple

Страница 1: ...Step 1 Before attaching the rear hook to the lifting mechanism Carefully place the hook in the gap between the rear window and the Jeep top from underneath with the window open Fig 1 Fig 2 Fig 1 Fig...

Страница 2: ...Hoist A Top Simple Installation Instructions Call toll free 1 866 284 7428 Langeoriginals com Copyright Lange Originals 1...

Страница 3: ...ur wall and ceiling Wire clamps must be checked and tightened regularly Do a dead weight lift to initially test your installation Upon lifting your top for the first time and subsequent times thereaft...

Страница 4: ...tor bolts 2 wing nuts 2 flat washers 2 standard 5 16 nuts 2 3 inch lag screws for attaching crank to the wall Tools and supplies needed 9 16 socket 11 16 socket 5 16 socket or nut driver Electric scre...

Страница 5: ...f 2x6 to 20 inches Mount it to your wall using at least 4 screws at least two in each stud aprox 50 inches above the floor 3 Mount your crank unit to the center of the 2x6 using the 2 3 inch lag screw...

Страница 6: ...th the double pulley in the top corner of the wall or the ceiling directly above the crank unit See page 6 4 Measure the distance from the wall to the back of your jeep where you plan to lift the top...

Страница 7: ...Call toll free 1 866 284 7428 Langeoriginals com Copyright Lange Originals 6 Strap long cable Hook short cable Four door strap hole Two door strap hole...

Страница 8: ...ide cable through the middle single pulley in the ceiling This line will be for the hook 5 Pull the right side cable through the front pulley this should be the pulley that was installed inch left of...

Страница 9: ...ting strap in between your top and the body of the Jeep Slip the grommet over the elevator bolt Hand tighten the wing nut To hold the strap in place Repeat on the other side note the 2 door will use t...

Страница 10: ...other Make the first pulley on center and the second pulley inch left of center This will allow the cables to run next to each other without interference 3 Mount the double pulley on a 20 inch 2x6 You...

Страница 11: ...Call toll free 1 866 284 7428 Langeoriginals com Copyright Lange Originals 10 34 inches Aprox 50 inches This distance is only limited by the remaining length of your cable 4 door hole Two door hole...

Страница 12: ...nt or repair of the product itself and does not cover consequential damage or injury Use at your own risk Please call customer service at 1 866 284 7428 for warranty returns and help If your product i...

Отзывы: