background image

4

1. Take the bottom wire deck(2), face the flat wire 

upside and position the dumping handle groove side 

to main handle. Put the bottom wire deck(2) on to the 

base frame (1) , fasten by bolt (3) and washer (4), 

locked by the pin (5) 

(See Figure 4)  

2. Attach the dumping handle(6) to the bottom wire 

deck(2), screwed by Flange bolt (7) and nut(8);

(See Figure 5)

Figure 3

ASSEMBLY- Main Handle

ASSEMBLY- Frame

1. Place the main handle of bottom part (1) into the base frame (2), fixed by 

Flange bolt (3) & Flange Nut(4)

2. Insert the main handle of top part (5) into bottom part (1) tube, fixed by Flange 

bolt (6) and nut (4).

3. Secure the wire by bellows clip (7) and binding (8), the main handle assembly 

finished.

(See Figure 3) 

Part No.

1
2
3
4
5
6
7
8

Description
Main handle bottom
Base frame
Flange bolt M8*70
Flange Nut M8
Main handle top
Flange bolt M8*40
Bellow sclip
Binding

Q’ty

1
1
4
6
1
2
3
3

Wheel assembly parts list

Figure 4

Figure 5

Содержание LBB0103

Страница 1: ...d all INSTRUCTIONS before operating Failure to follow the safety rules and other basic safety precautions may result in serious personal injury Save these instructions in a safe place and on hand so t...

Страница 2: ...nly manufacturer recommended replacement parts and accessories PERSONAL SAFETY WARNINGS 1 This is not a toy Children under 14 years of age are not allowed to operate it 2 Stay alert watch what you are...

Страница 3: ...the lock lever is fully pulled down and completely locked 7 Load and unload objects on flat ground 8 When lifting and tilting the carrier or bucket hold the handles and frame firmly and work in a stab...

Страница 4: ...groove Tighten the wheel by nut 4 and lock by Cotter Pin 5 3 Assemble another wheel 6 in the same way See Figure 1 4 Align the swivel wheel 7 bracket holes with the welded bolt 9 assemble it on and ti...

Страница 5: ...SSEMBLY Main Handle ASSEMBLY Frame 1 Place the main handle of bottom part 1 into the base frame 2 fixed by Flange bolt 3 Flange Nut 4 2 Insert the main handle of top part 5 into bottom part 1 tube fix...

Страница 6: ...10 Pin 3 60 Dumping handle Flange bolt M8 70 Flange nut M8 Left Right frame Front Back frame Pin 4 80 Handle bar Q ty 1 1 2 1 2 1 2 2 2 2 8 4 Frame assembly parts list ASSEMBLY Frame The finished powe...

Страница 7: ...the start switch C on the right handle then the battery indicator D will light up with all 3 LED lights and machine is ready for working Press and hold the Switch trigger E to start working By pressin...

Страница 8: ...g battery capacity is not enough charge the battery or replace it with a charged one REMAINING BATTERY CAPACITY CHECKING During the normal working the 3 LED lights of battery indicator are all on whic...

Страница 9: ...such as O rings seals and lubricants accessory parts 5 The electric power cart must be installed and maintained in compliance with the instructions Problem s The power cart does not run The power car...

Страница 10: ...ge bolt M6 15 Battery case Lithium battery Motor driver Dumping handle Dumping handle grip Carrier lock lever Q ty 2 1 1 1 2 2 21 4 3 1 1 1 1 4 4 1 1 1 1 1 1 Part No 22 23 24 25 26 27 28 29 30 31 32 3...

Отзывы: