3-18
F-581-R1
TROUBLESHOOTING AND CORRECTIVE MAINTENANCE
Figure 3-3: Side Shifter
8.
Cap and plug the hoses and cylinder ports. Also tag
the hoses for identification. Have rags handy for
spills.
9.
Remove side shift assembly and replace in reverse
order.
Figure 3-4: Hydraulic Control Valve Assembly
Mast Assembly Service
WARNING
Removing the Mast From the Truck
To remove the mast, the work area must be clean, clear
of obstacles and large enough to lay the mast
horizontally on the floor. The overhead crane and frame
need to be rated to at least three (3) tons and have three
or four 6” x 6” x 48” (53 mm x 53 mm x 1,219 mm) solid
planks of wood available for blocking.
1. Thoroughly steam clean the mast, removing all dirt,
debris and grease.
2.
Record the roller clearances and chain adjustments
before removing the carriage or rails. See “Mast
Maintenance” on page 2-17, Planned Maintenance.
3.
Review “Before you Begin,” on page 1-1.
4.
Remove the forks. Review “Removing Forks,” on
page 3-17.
• Only trained and experienced technicians or
your Landoll service representative must be
allowed to service the mast assembly.
• NEVER place any part of your body into the
working area of the mast.
• NEVER work on the mast while it is loaded,
remove the load first.
• Be cautious and follow all safety precautions.
Содержание Bendi B40i4
Страница 2: ......
Страница 26: ...1 20 F 581 R1 INTRODUCTION SAFETY AND INSPECTION...
Страница 100: ...3 52 F 581 R1 TROUBLESHOOTING AND CORRECTIVE MAINTENANCE...
Страница 120: ...4 20 F 581 R1 CALIBRATION AND PROGRAMMING...
Страница 129: ...ENGINE WITH FUEL SYSTEM 5 9 Figure 5 10 Fuel System Troubleshooting...
Страница 133: ...ENGINE WITH FUEL SYSTEM 5 13...
Страница 134: ...5 14 F 581 R1 ENGINE WITH FUEL SYSTEM...
Страница 140: ...6 2 F 581 R1 GM ENGINE SUPPLIER PROVIDED DOCUMENTATION...