3-18
F-721-0513
ASSEMBLY INSTRUCTIONS
Depth Gauge Installation
NOTE
The depth gauge assembly is attached to the coulter
gang tube and front frame tube and may be placed at the
discretion of the operator.
1.
Attach depth gauge guide to the front frame tube
using 5/8-11 x 6-11/16 x 5-1/2 u-bolt and flange head
serrated nuts
2.
Attach depth gauge mount to the coulter gang tube
using 5/8-11 x 6-11/16 x 7-1/2 u-bolt and flange head
serrated nuts.
3.
Slide depth indicator gauge w/ decal through slot in
depth gauge guide. Attach depth indicator gauge to
depth gauge mount using 1/2-13 x 5 hex head cap
screw and hex lock nut.
Содержание 2131
Страница 2: ......
Страница 11: ...STANDARD SPECIFICATIONS 2 5 Table provided for general use NOTES...
Страница 34: ...2 28 F 721 0513 STANDARD SPECIFICATIONS...
Страница 76: ...3 42 F 721 0513 ASSEMBLY INSTRUCTIONS Table provided for general use NOTES...
Страница 95: ......