VISTA CHARCOAL GRILL
ASSEMBLY INSTRUCTIONS
PAGE 12
STEP 12: ASSEMBLE THE HANDLES
AND ASH TRAY
Assemble the lid handle [ AA ] to the lid
[ A ] using (2) M5 x 16MM bolts [ BF ]
and (2) finishing washers [ BA ].
Assemble the ash tray handle [ AB ] to
the ash tray [ G ] using (2) M5 x 16MM
bolts [ BF ] and (2) finishing washers
[ BA ].
Insert ash tray into the bottom of the
cooking chamber.
STEP 11: ASSEMBLE THE CHIMNEY
Insert the chimney [ T ] from inside the
lid through the hole. Assemble with (3)
M4 x 10MM bolts [ BQ ] and (3) M4
hexnuts [ BR ]. Tighten bolts securely.
Place the chimney cap [ Z ] on the
chimney and assemble using (1) M6 x
10MM bolt [ BC ], (1) flat washer [ BM ]
and (1) lock washer [ BN ]. See STEP
11A. Tighten enough to allow the cap
to move.
DO NOT RETURN PRODUCT TO THE STORE.
IF YOU HAVE QUESTIONS OR HAVE
TROUBLE WITH ASSEMBLY, PLEASE CALL
1-877-347-4557 FOR ASSISTANCE.
DO NOT OPERATE GRILL WITHOUT
ASH TRAY IN PLACE. DO NOT OPEN
ASH TRAY DURING USE. KEEP ASH
TRAY CLOSED UNTIL ALL ASHES
HAVE COOLED.
WARNING!
!
12
STEP
11
STEP
11A
STEP
BF
BQ
BR
BA
G
AA
AB
T
BF
BA
BC
BM
BN
Z
T