5
LANDMANN
Assembly
CAUTION!
For your safety the heads of the screws should
always point outward, otherwise injuries can
occur.
Only firmly tighten all screw connections after
assembly is concluded, otherwise undesired
material tension can occur.
1. Turn the boiler (F) upside down and screw the
stand (N) via the M5x8 screws and MD nuts to
the tightly to the boiler. Place the boiler right
side up after assembly.
2. Mount the boiler handles (E) on the sides of the
boiler (F) via the MD screws and MD nuts.
3. Fasten the hinge (K) onto the boiler (F) via the
M4x8 screws and M5 nuts.
4. Mount the lock bracket (H
1
) on the boiler door
(H
2
) via the M4x8 screw and M4 nut.
5. Fasten the holder for the lock bracket (G) to the
boiler (F) via the M4x8 screws and M4 nuts.
6. Insert the boiler door (H
2
) in the hinge (K) and
fix the boiler door (H
2
) in place with the nut (I).
Secure the bolt (I) by introducing the splint (J)
through the hole on the end of the bolt.
7. Fix the connecting tube (O) on the rear part of
the boiler (F) via M5x8 screws and M5 nuts.
Connection elements
(
pre
-
assembled
connecting
elements
are
included
in
the
itemisation
!)
8. Place the chimney (P) on the connecting tube
(O) and place the roof (Q) on the end of the
chimney (P).
9. Fasten the wooden handle (L) onto the ash
collection box (M) via a wood screw Ø3.5x20.
Slide the ash collection box (M) into the
provided holder on the floor of the boiler.
10. Place the charcoal grate (D) and the pot (C) in
the boiler (F).
WARNING!
The boiler must be placed on a stable and firm
substrate during operation, otherwise it can
tip over.
M5x8
10x
M4x8
5x
Ø3,5x20
1x
M5x12
4x
M5
14x
M4
5x
Ø6
6x