Recumbent Bike Assembly
20
Note:
Move the shipping crate/pallet to location of final
assembly. Allow 3-5 feet working space to safely remove
box and pallet. If assembly space is limited, you may lift
the rear of the assembled upright bike and roll it to its final
location.
1. Remove strapping from box and pallet. Use caution, straps
may be under tension.
2. Lift and remove outer box, set aside for disposal.
3. Carefully remove protective shrink wrap from bike base and
component boxes.
4. Cut and remove four plastic straps holding bike base to
pallet.
5. Remove upright tube/handle bar assembly, console and
accessory boxes from recumbent bike base, set aside for
assembly.
6. Remove protective plastic bag and contact HR grip covers.
7. Carefully team lift the recumbent bike base off of shipping
pallet onto a solid level surface for assembly.
8. Locate the plastic bag that contains the Owner's Manual
and the Hardware Kit.
2.3.
Assembly
1. Position the base where the bike is to be located:
•
Allow a minimum clearance of 3 feet (92 cm) on each
side of the bike.
•
Allow a minimum clearance of 18 inches (41 cm) at the
front and rear of the bike.
2. With the recumbent bike base position on a solid, level
surface, install the upright tube onto recumbent bike base
(Figure 2-1) using (4) M10x20 socket head cap screws, #22
and (4) M10 split lockwashers #21 from the hardware kit.
Fully tighten hardware.