Section 2: Operating Instructions
PS1572: Primary Seeder: 313-164M:
11/5/18
9
9. Manually adjust one of the two lower 3-point lift arms
up or down to level the seeder from left to right.
10. Manually adjust the length of the top center 3-point
link to level the seeder from front to rear.
Hook-up LED Lights
The lead wiring harness (#5) is equipped with a 7-way
round pin connector for connecting to the tractor’s 7-pin
electrical outlet shown in Figure 2-3.
1.
Connect lead wire harness (#5) to the tractor’s 7-way
round pin receiver.
2. It is best to have a second person verify the lights are
operating. Start tractor and operate lights as follows:
a. Turn on head lights to verify red lights illuminate.
b. Turn on flasher lights to verify amber light are
blinking on and off.
3. If lights did not operate properly, check all electrical
connections on the wire harness (See Figure 2-4).
Yellow and red wires with same pin letters should
match at the connections. Make necessary changes
and repeat step 2 above.
4. Check wire harness routing to make sure wires will
not be pinched as the seeder is raised and lowered.
5. Add cable ties (#6) to the wire harness as needed to
secure the harnesses in place.
Refer to Figure 2-5 on page 10:
6. Relocate SMV Safety sign from back of your tractor
to the SMV mounting bracket (#6) on the back of the
seeder. If needed, a SMV sign can be purchased
from your nearest Land Pride dealer. Refer to
Moving Vehicle Sign (Accessory)”
Rear Roller Pin in Field Position
Figure 2-2
Tractor 7-Pin Electrical Outlet
Figure 2-3
Electrical Connector Pin Letters
Figure 2-4
11640
11640
Tractor Hook-up
Figure 2-1
37298
25998