![Land Pride PFS4000 Скачать руководство пользователя страница 21](http://html1.mh-extra.com/html/land-pride/pfs4000/pfs4000_operators-manual_3508961021.webp)
Section 2: PFS4000 Assembly & Set-Up
PFS4000, PFS5060 & PFS8010 Pendulum Spreaders 309-124M
11/20/20
17
Gate Lever Assembly
Refer to Figure 2-3:
1. Attach gate lever mounting bracket (#2) to spreader
main frame bracket (#5) with M10 x 25 (1") hex
screws (#1), flat washers (#3) and hex nuts (#4).
Draw nuts up snug, do not tighten.
2. Attach gate handle (#6) to gate lever (#7).
3. Attach gate lever (#7) to mounting bracket (#2) with
M10 x 80 (3 1/8") screw (#12), nylon bushing (#11),
40 x 30 x 10 mm compression spring (#10), flat
washer (#9) and self locking nut (#8). Draw nut up
snug, do not tighten.
4. Spread fork on end of regulation bar (#15) and attach
gate lever to regulation bar with M6 x 25 (1") hex
head bolt (#14) and hex nylock nut (#13).
Gate Lever Assembly
Figure 2-3
30761
Nylock Nut must have
full thread engagement.
5.
See Detail “A”:
Draw hex nut (#14) up until bolt has
approximately 3/32" movement. Make sure nylock
nut has full thread engagement.
6. Adjust height of mounting bracket (#2) as needed to
level regulation bar (#15).
7. Tighten hex nuts (#4) to the correct torque.
8. Tighten nylock nut (#8) until lever (76) has enough
resistance to not move during field use. Some
adjustment to nut (#8) may be required during field
application. Make sure nylock nut has as a minimum
full thread engagement.
9. Turn to page 24 for “Driveline Assembly and Set-Up”
instructions.