![lancer IBD 22 Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/lancer/ibd-22/ibd-22_operation-manual_3525949011.webp)
11
Installing Remote Syrup Pumps - Bag In Box
A
B
C
A. Syrup Pump
B. CO2 Line
C. Fitting
D. Oetiker Pliers
D
1. Install BIB rack and remote pumps according to
manufacturers’ instructions.
2. Once pumps and BIB rack are installed, measure and cut
tubing to length between the pump CO
2
inlets, then connect
tubing to all pumps.
3. Using tubing cutters, cut any pump CO
2
supply line and
install tee fitting, then route appropriate tubing from the CO
2
supply to the tee fitting at syrup pumps.
A
B
C
A. Syrup Pump Outlet
B. Syrup Pump
C. Fitting
4. Connect tubing from dispenser syrup inlet to the syrup
pump outlet fitting. Repeat for each syrup line/pump. Re
-
peat Steps 1-5 for all flavor injector lines.
A. Tee Fitting
B. Line to Syrup Pump
C. Fitting
D. Line to CO
2
Supply
A
B
C
D
Use proper connector for syrup manufacturer
!
ATTENTION
A. Syrup Pump Inlet
B. Fitting
C. BIB Connector
D. Oetiker Pliers
A
B
C
D
A. Syrup Pump Inlet
B. BIB Connector
C. BIB Syrup Container
A
B
C
5.
Install BIB (bag in box) connectors onto the syrup pump
inlet tubing.
6. Connect syrup BIBs to connectors. Repeat for each syrup
line/pump and each flavor injector line/pump.