BEV85 Annual Operational Service
Work Instruction
www.lancerbeverage.com
Page 4 of 4
Images are for illustration purposes only as product may vary.
No 074
– 1 November 2018
19
Replace cylinder head
assembly
20
Tighten all 12 head bolts
Follow tensioning pattern
Hand tighten each bolt,
clockwise, extra leverage is
not required.
Each bolt has a spring
washer, fitted to assist with
securing the fixing.
Aluminum threads strip easily.
21
Connect High Pressure
hose
Using a Spanner, Turn anti-
Clockwise to tighten hose
fitting.
22
Replace heat covers
PH2 Phillips heads
2 x heat covers
Replace heat covers, secure
each with 2 fixing screws.
23
Re-connect and energise
the electrical supply to the
air compressor
Plug electrical lead into socket
outlet and lift red button on
pressure switch to turn on the
air compressor.
24
Check for air leaks
Monitor the tank pressure
gauge, listen for leaking air
(hissing) and/or use soapy
water to inspect air fittings,
pipe joints & connections.
Compressor will run for about
1 minute 30 second before
cycling off.
Check the NRV Operation
When the compressor
reaches its cut-out pressure
there should be a shot of air
from underneath the pressure
switch. If this shot of air is not
evident or the air continually
leaks replace the Non-Return
Valve Seal & Spring.
25
Test auto-drain
Press the “TEST” button on
the Auto Drain which should
release a burst of air and then
stop.
If this does not work have the
compressor checked by an
approved service agent.
26
Re-connect air supply
Turn the supply air tap on, ¼
turn. Handle will be in line with
the hose.
This is the red handle.
27
Change Over to
Compressed Air supply
Switch main Beverage Control
Panel over to Compressed air
supply from CO2 supply.