89
5
Functional Description with Process Diagrams
5.2.3.3 Required Parameters
5.2.3.4 Purging After Operation
If 'Purge fuel train' is active then all the fuel valves are closed after the burner ON signal has
been removed, i.e. the burner is commanded off. The atomiser valve remains active and the
oil valve is set to its purge position. The spark igniter and pilot valve are then activated and
once the flame has been established the stabilisation timer is started and run. Pilot flame mon-
itoring is active during this period. The pilot flame or main flame must be lit during purge op-
eration. The purge process is only started once a flame has been established.
The function can be used only if CMS is configured to ’Start with pilot burner’.
After the stabilisation time t2 for the pilot flame is complete (P 310), the system waits until the
oil actuator has reached the purge position.
P 812 = 0
→
the parameter set purge duration t3 (P 810) starts, while the actuators move to
the programmed special point ’Purge oil gun’.
P 812 = 1
→
The programmed special point ’Purge oil gun’ is moved to before the time t3 ex-
pires. .
After the expiry of t3, the purge valve and atomiser valve are closed. The spark igniter and
pilot valve are also deactivated. The burner sequencer transitions to the mode OFF.
NOTICE
If the burner should reach low fire before purging, the control release must be removed before
the switch-off command and the time taken for the burner to reach base fire must be waited
out.
P no.
Description
Attributes
809
Extension of 2
nd
safety time [s]
V1.0.0.0
Extension of 2
nd
safety time in s for e.g. oil gun or gas train purging
0: no purging
1…999: extension of 2
nd
safety time for oil
Write: 4/GUI/UI
Read: 0
Default: 0
Min.: 0
Max.: 999
810
Duration of purging/blow out [s]
V1.0.0.0
Duration of purge process (purging, blow out) in s
0: No purging
1…999: Duration of process
Write: 1/GUI/UI
Read: 0
Default: 0
Min.: 0
Max.: 999
812
Delay in opening purge valve. (0 – valve opens after closing the fuel valve; 1 – valve opens
after reaching ignition position.)
V1.0.0.0
Delay in opening purge valve
0: The valve opens after closing of the fuel valve.
1: The valve opens after reaching the ignition position.
Write: 4/GUI/UI
Read: 0
Default: 0
Min.: 0
Max.: 1
813
Activation of the purging process: (0 – no purging; 1 – automatic after switching off or manu-
ally via input; 2 – manual only via input)
V1.0.0.0
Setting whether and how purging is activated.
0: no purging
1: automatic purging after switch-off or purging is started manually by an input
2: purging is started manually by an input
Write: 4/GUI/UI
Read: 0
Default: 0
Min.: 0
Max.: 255
Содержание AEC-TPS
Страница 1: ...www lamtec de Sensors and Systems for Combustion Engineering Manual Combustion Management System CMS...
Страница 2: ......
Страница 42: ...41 4 CMS Components 4 2 5 Terminal Assignment Fig 4 9 AEC TPS 230 VAC or 120 VAC terminal assignment...
Страница 131: ...130 7 Operating Control and Displays 7 1 5 5 Deleting Curves Delete firing rate curve...
Страница 142: ...141 7 Operating Control and Displays Accessing channel information AL1 Fig 7 12 GUI6xx channel information...
Страница 148: ...147 7 Operating Control and Displays Channel configuration AL1 Fig 7 18 Channel configuration...
Страница 154: ...153 7 Operating Control and Displays Accessing the CO O2 settings AL2 Fig 7 24 CO O2 settings menu...
Страница 157: ...156 7 Operating Control and Displays Fig 7 27 System CRCs menu...
Страница 162: ...161 7 Operating Control and Displays Fig 7 32 IP setting menu...
Страница 163: ...162 7 Operating Control and Displays 7 2 8 User Settings Accessing the display settings Fig 7 33 Display settings menu...
Страница 164: ...163 7 Operating Control and Displays Accessing the language settings AL1 Fig 7 34 Language settings menu...
Страница 166: ...165 7 Operating Control and Displays Fig 7 35 Installation...
Страница 167: ...166 7 Operating Control and Displays Fig 7 36 Installation...
Страница 176: ...175 7 Operating Control and Displays Fig 7 49 Loading a protected dataset into the device...
Страница 198: ...197 7 Operating Control and Displays 1 Digital inputs 2 Digital outputs 3 PLC Signals 4 Analogue measurement values...
Страница 202: ...201 7 Operating Control and Displays Replacing a Module Fig 7 81 Module replacement menu...
Страница 271: ...270 10 Maintenance 6 Close the window Connection between PC and CMS is established Indication of the con nected CMS...
Страница 272: ...271 10 Maintenance How to update the firmware in the CMS AL2 1 Open the menu Firmware update 2 Prepare firmware update...
Страница 274: ...273 10 Maintenance Activating the Debug Data 1 Start CMS Remote Software 2 Set device online 3 Show debug data...
Страница 276: ...275 10 Maintenance 3 Restart CMS to complete the update...
Страница 282: ...281 12 Appendix 12 5 EU Declaration of Conformity...
Страница 283: ...282 12 Appendix...