background image

15 

 

5.10  Stove inactivity 

At the end of the season, perform the following operations: 

 Remove all pellets from the tank and from the chute; 

 Thoroughly clean the brazier, the brazier support, the combustion chamber and the ash drawer; 

 Clean all dust, spider webs, etc. from the area behind the panels of the inner cladding once a year, 

 Leave the door half open so as to prevent any condensate inside the combustion chamber. 

 

5.11  Routine and special maintenance 

These operations must be scheduled YEARLY with a Technical Support Centre

 and are required 

to ensure the product is kept efficient and ensure safe operation. 

 Thorough cleaning of the combustion chamber; 

 Cleaning and inspection of the smoke exhaust duct; 

 Verifying proper seal of the inspection door springs and gaskets 

 Cleaning the mechanisms and moving parts; 

Содержание IDRO Hot Spot 13

Страница 1: ...fully read the instructions and information before use Dear customer thank you for choosing one of our products which is the result of technological expertise and our continuous quest for superior pro...

Страница 2: ...operate the hot spot with regulation wood pellets refer to the FUEL chapter Never use liquid fuels to operate the product and to stoke the embers present Discontinue use of the product in the event of...

Страница 3: ...ling up the tank 10 4 3 Ignition 11 4 4 Combustion mode 11 4 5 Brazier cleaning 12 4 6 Shutdown 12 5 WARNINGS AND MAINTENANCE 13 5 1 Opening the door 13 5 2 Disposal of ashes 13 5 3 Brazier cleaning 1...

Страница 4: ...3 kW Hourly consumption min max 1 5 2 5 Kg h Pellet tank capacity 13 Kg Weight 90 Kg Dimensions LxPxH 546x520x2118 mm 1 3 Product identification data data label The technical label shows device data a...

Страница 5: ...dusty and with regular length LOW QUALITY pellets are of varied lengths dusty with vertical and horizontal splits Since pellet characteristics and quality greatly influence the autonomy efficiency and...

Страница 6: ...and slide it to the bottom Fig 3 3 Place the support plate and the lower dish over the pipes then secure everything with the supplied wing nuts Fig 4 4 Lay the three support and the upper dish then s...

Страница 7: ...en moving the package move with slow and continuous movements to avoid tearing the ropes chains etc Do not tilt excessively in order to avoid overturning Do not stand within range of the loading unloa...

Страница 8: ...n the event of pellet supply when the product is on make sure that pellets are not finished and that the flame is always present and live in the brazier Do not refill the tank if you notice that the p...

Страница 9: ...9 PELLET LOADING DOOR 4 1 Instructions for use AIR ADJUSTMENT BRAZIER SHAKER COMBUSTION CHAMBER DOOR...

Страница 10: ...the lid B by turning the knob towards the open position fig 10 Raise the lid B and put pellet in the tank fig 11 Lower the lid B and move the handle towards the closed position fig 18 The pellets can...

Страница 11: ...es a minimum height of about 7 cm so as to lick the holes located in the rear wall The hot spot is now on CAUTION always clean the brazier prior to each ignition to avoid false starts and production o...

Страница 12: ...ig 17 the fall of the pellets into the brazier will stop Combustion will continue for about 20 minutes after which the machine will switch off To switch the hot spot back on move the lever to position...

Страница 13: ...y black smoke it may mean that there are ash deposits or incrustations which are not allowing correct hot spot operation and which must be removed To perform periodical cleaning remove the brazier by...

Страница 14: ...uld slow down or block the pellets falling into the brazier Fig 20 Fig 21 CAUTION RISK OF BURNS CAUTION Perform this operation when the hot spot is cold 5 8 Cleaning the glass part of the door The doo...

Страница 15: ...cladding once a year Leave the door half open so as to prevent any condensate inside the combustion chamber 5 11 Routine and special maintenance These operations must be scheduled YEARLY with a Techni...

Страница 16: ...Laminox S r l Divisione Idro Zona Industriale Callarella 261 263 62028 SARNANO MC Italy Tel 39 0733 657 622 Fax 39 0733 657 494 www laminox com e mail idro laminox com rev 2 0 2018 EN...

Отзывы: