background image

5

Operating Instructions
Precipitation Sensors (15188)+(15188 H)

(15188) Precipitation Sensors

Operating Instructions

Initial operation

If the sensor system has been completely mounted and
electrically assembled, the sensor will be ready for opera-
tion. The operational check has to be performed.

Maintenance and operational check

The precipitation sensor is nearly maintenance-free. The
sensor should be checked and cleaned periodically in or-
der to guarantee its proper operation, since dirt accumula-
tion may cause errors of measurement. The time interval of
cleaning depends on the local conditions.
The 

operational check

 of the sensor may be performed by

the use of artificial precipitation. The volume of a 200 cm³ resp.
400 cm³ (by 4 cm³ buckets ) test container of water must be
conducted into the collecting funnel through a nozzle in such a
way that the drops fall into the funnel beside the outlet. The
nozzle of the test container (approx. diameter 0.6 mm) should
be adjusted  to allow a complete water run out into the funnel
within 10 to 12 minutes.
After the artificial precipitation has gone through, 100 ± 2
bucket tippings should have been counted.
Rinse the sensor thoroughly for cleaning. Clinging parti-
cles of dirt in the collecting funnel or outlet pipe may be re-
moved with a piece of wood.If unsatisfying measurement
results occur after this cleaning procedure, the tipping buck-
et should be disassembled for cleaning.

Absolute care must be taken not to damage the
tipping bucket!

The dismounted tipping bucket can be cleaned by placing
it in warm water with some scouring material and by care-
fully scraping off unwanted dirt using a small piece of
wood.

 

Содержание 15188

Страница 1: ...oof 2 cm tipping bucket 2 g water for precise precipitation mea suring in regions with normal rain falls 4 cm tipping bucket 4 g water for precise precipitation mea suring in regions with heavy rain f...

Страница 2: ...g bucket The tipping bucket can hold 2 cm 2 g resp 4 cm 4 g of water The collecting surface of 200 cm WMO standard means that one bucket charge is equivalent to a precipitation rate of 0 1 mm resp 0 2...

Страница 3: ...hen fitting the tipping bucket proceed with utmost caution so that the sharp edges of the tipping bucket are not damaged and the middle wall is not bent During operation the tipping bucket lies on the...

Страница 4: ...rical connections The sensor will be connected to the cable by leading the cable through the conduit gland to the connector inside the sensor housing Recommended cable type 2 4 x AWG 2O CU L sw diamet...

Страница 5: ...cm buckets test container of water must be conducted into the collecting funnel through a nozzle in such a way that the drops fall into the funnel beside the outlet The nozzle of the test container a...

Страница 6: ...ing Instructions Precipitation Sensors 15188 15188 H 15188 Precipitation Sensors Operating Instructions fig 7 with heating without heating Connecting diagrams for use of the bounce free signal output...

Страница 7: ...7 Operating Instructions Precipitation Sensors 15188 15188 H 15188 Precipitation Sensors Operating Instructions fig 8 with heating without heating Connecting diagrams to data logger TROPOS...

Страница 8: ...0 5 A Dimensions See dimensional drawing Suitable for mounting 60 mm Weight Approx 4 kg Standards WMO No 8 VDI 3786 Bl 7 EN 50081 82 VDE 0100 15188 W4 Variety with 4 cm3 bucket unheated Data like 1518...

Отзывы: