
Taura 24 MCS W TOP
32
A
A
B
Fig. 4
Combustion analysis
Two sampling points have been included at the top
of the boiler, one for fumes and the other for air.
To take the samples:
1)
Insert the probes as far as the stop;
2)
Open a hot water tap;
3)
Adjust the hot water temperature to maximum.
4)
Wait 10-15 minutes for the boiler to stabilize*
5)
Take the measurement.
Analyses made with an unstabilized boiler can
cause measurement errors.
Air
Fumes
Fig. 5
Opening the casing
To open the boiler casing:
1
Unscrew the four screws
A
2
Lower the inspection door
3
Raise and remove the casing
B
Before carrying out any operation inside the boiler, disconnect the electrical power supply and close the gas
cock upstream.
Содержание Taura 24 MCS W TOP
Страница 92: ...92 Taura 24 MCS W TOP 1 93 2 94 3 99 4 a a 106 90 396 92 42 73 23 93 68 89 336 93 68...
Страница 94: ...94 Taura 24 MCS W TOP 1 3 3 led RESET 1 30 3 1 0 led 2 3 1 4 1 0 1 5 bar 7 74 2 2 1 2 2 90 396 LEJ LINE...
Страница 95: ...95 Taura 24 MCS W TOP 2 3 6 IV 25 Fr 6 C 2 4 7...
Страница 103: ...103 Taura 24 MCS W TOP 3 2 1 3 4 3 3 1 1 5 bar...
Страница 104: ...104 Taura 24 MCS W TOP A A B 4 1 2 3 4 10 15 5 5 1 A 2 3 B...
Страница 105: ...3 4 3 led 3 1 RESET 1 RESET led 105 Taura 24 MCS W TOP 60 sec led...
Страница 106: ...60 5 64 5 60 60 95 60 1 2 3 4 5 4 A A 4 1 6 1 3 4 2 1 2 3 1 2 4 1 2 5 3 4 LEJ LINE 106 Taura 24 MCS W TOP...
Страница 110: ......
Страница 111: ......