TAURA 24 MC W TOP
28
A
A
B
Fig. 4
Opening the casing
To open the boiler casing:
1
Unscrew the four screws
A
2
Lower the inspection door
3
Raise and remove the casing
B
Before carrying out any operation inside the boiler, disconnect the electrical power supply and close the gas
cock upstream.
Combustion analysis
To analyse the combustion, you must:
1) Insert the probe in the flue;
2) Open a hot water tap;
3) Adjust the hot water temperature to maximum.
4) Wait 10-15 minutes for the boiler to stabilize*
5) Take the measurement.
Analyses made with an unstabilized boiler can cause measurement errors.