4
Mounting Instructions
Lifelink MOB Danbuoy & Horseshoe is designed to fit most conventional
boat rails.
It can be installed onto horizontal rails but also at the intersections
of vertical and horizontal rails.
Case must be in vertical position, on the
outer side of rails.
The location should be selected carefully so that there is
a clear path under the case to allow free fall of both the lid and the equipment
into the sea. No obstacles should exist in the path. Otherwise, parts could
become entangled and not perform as intended.
All necessary screws are included within the product’s packing.
Do NOT drill
holes or use other screws
rather than those coming with the product as this
could damage the case and the safety equipment inside.
For the installation of the case onto the rails, product comes with 4 SS plates
and 8 SS cap screws M8x16 ISO 10642.
Depending on the placement
of rails, there are 2 possible
positions to install the case,
as shown:
IMPORTANT NOTE!
Distance between horizontal rails: 300-310mm
Max rail diameter: 25mm
After Activation
After devices have been activated, the crew should bring them aboard.
If
possible, all materials should be rinsed with clean water and let air-dry. Then,
the inflatable devices should be completely deflated.
To deflate chambers,
remove oral inflation tube cap, insert the nipple of the cap strap and hold into
the valve. Apply gentle pressure to the chamber and deflate it. Re-install the
cap in the normal position on the inflation tube.
For reuse, Lifelink MOB
Danbuoy & Horseshoe must be serviced and repacked by an authorized
LALIZAS Service Station.
Cleaning
Lifelink MOB Danbuoy & Horseshoe hard container and flotation devices
may be cleaned with mild soap and water.
Never use harsh chemicals
on or around this product. If exposed to harsh chemicals such as hydraulic
fluids, oils or solvents, have the unit cleaned and inspected by an authorized
LALIZAS Service Station.
In any case, attention should be
paid while installing the case
onto rails so that it does not
accidentally fall into the sea.
After screwing all 8 M8x16 DIN 7991 screws,
make sure that the case is steady and
check again that no obstacle interferes
between the case lid and the sea surface.
Servicing Instructions
Lifelink MOB Danbuoy & Horseshoe
requires inspection and service from
an authorized LALIZAS Service Station
after each use or 3 years after the
manufacturing date.
Failure to comply with this requirement may lead Lifelink
MOB Danbuoy & Horseshoe not to perform as designed.
IMPORTANT NOTE!
It is recommended that the Lifelink MOB Danbuoy
& Horseshoe should be removed from the rail and
stored below if the boat is moored for extended
periods.
2 horizontal rails
Intersection of 2 horizontal
rails with a vertical one