![Lakes Bathrooms COASTLINE LEVANZO Cannes Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/lakes-bathrooms/coastline-levanzo-cannes/coastline-levanzo-cannes_installation-and-maintenance-instructions-manual_3349745006.webp)
C
Align & push bypass assy onto glass edge firmly until
aluminium is fully seated onto glass edge over entire
height.
CHECK that alum #1 is completely straight using a long
(1.5m) straight edge or spirit level.
If bow is present, the ‘high’ areas should be pressed
further by hand, or using a block of wood for protection,
may be ’knocked on’ with a mallet or hammer until
straight.
Check door motion is smooth & free of resistance.
Clean off ALL excess silicone sealant with a damp cloth
or alcohol wipe.