background image

Use a screw driver to separate your light fixture. The 
battery is 

NOT

connected when shipped. You must 

connect battery in order for the product to function.

Use screw driver to remove cover & silicone pad. 
Connect Battery & LED. 

Tuck wires neatly so they do not obstruct the silicone pad.
Reassemble silicon pad and cover and tighten securly. 

Battery
Connector

1

2

SOLAR PAGODA LITE

MODEL: LL-SPL-PAG-WBA

Screws

Screw Covers

TOP

Level 2

Level 1

Base

Mount

You MUST open the 

light and connect 

the battery for the 

product to function

Cover & LED

Silicone Pad

Change brightness/power level at night by waving the 
magnet over the solar panel

Holding the magnet for 5-seconds in the activation area 
will change to the next LED color. You may then change 
between brightness/power levels on that LED color.

Power Setting

* Run Times

100%

6-8 hrs

80%

7-9 hrs

65%

10-12 hrs

50%

13-14 hrs

35%

15-17hrs

20%

17-22 hrs

OFF 

OFF

Holding for 5-seconds

Changes LED color

* Note: 

Run times will vary significantly based on;

Seasonal Sun Angle, Sun Exposure, Geographic
Location, Shading, Installed Location/Position, Battery

Condition, Brightness Setting, etc… The following run

times should only be used as a general reference and
are not guaranteed. Consider your local environment.

3

4

NEW MAGNET 

SWITCH OPERATION 

CHANGING BRIGHTNESS LEVELS

Wave the magnet over the solar 
panel at night until you find the 
activation area which changes 
the brightness level.

Make a quick up & down motion 
over this area to change between 
brightness levels  and OFF.

NOTE: 

moving too slowly may 

activate the magnet switch 
multiple times going through 
multiple levels at once. A quick 
motion will help!

CHANGING LED COLORS

Hold the magnet over the 
activation area for 5 seconds 
until the LED color changes

Magnet

Lake Lite Inc.

100 Industrial Dr.

Avilla, IN 46710

Phone: 260-918-2758
E-mail   [email protected]

Website www.lakelite.com

Отзывы: