Use a screw driver to separate your light fixture. The
battery is
NOT
connected when shipped. You must
connect battery in order for the product to function.
Use screw driver to remove cover & silicone pad.
Connect Battery & LED.
Tuck wires neatly so they do not obstruct the silicone pad.
Reassemble silicon pad and cover and tighten securly.
Battery
Connector
1
2
SOLAR PAGODA LITE
MODEL: LL-SPL-PAG-WBA
Screws
Screw Covers
TOP
Level 2
Level 1
Base
Mount
You MUST open the
light and connect
the battery for the
product to function
Cover & LED
Silicone Pad
Change brightness/power level at night by waving the
magnet over the solar panel
Holding the magnet for 5-seconds in the activation area
will change to the next LED color. You may then change
between brightness/power levels on that LED color.
Power Setting
* Run Times
100%
6-8 hrs
80%
7-9 hrs
65%
10-12 hrs
50%
13-14 hrs
35%
15-17hrs
20%
17-22 hrs
OFF
OFF
Holding for 5-seconds
Changes LED color
* Note:
Run times will vary significantly based on;
Seasonal Sun Angle, Sun Exposure, Geographic
Location, Shading, Installed Location/Position, Battery
Condition, Brightness Setting, etc… The following run
times should only be used as a general reference and
are not guaranteed. Consider your local environment.
3
4
NEW MAGNET
SWITCH OPERATION
CHANGING BRIGHTNESS LEVELS
Wave the magnet over the solar
panel at night until you find the
activation area which changes
the brightness level.
Make a quick up & down motion
over this area to change between
brightness levels and OFF.
NOTE:
moving too slowly may
activate the magnet switch
multiple times going through
multiple levels at once. A quick
motion will help!
CHANGING LED COLORS
Hold the magnet over the
activation area for 5 seconds
until the LED color changes
Magnet
Lake Lite Inc.
100 Industrial Dr.
Avilla, IN 46710
Phone: 260-918-2758
E-mail [email protected]
Website www.lakelite.com