23
1)
Remove the back panel after unscrewing the 4 screws.
2)
Feed the mains cable through one of the cable bushings and make the connection to the terminal. Then
do the same with the wires for the implementation of the safety circuit.
3)
Remount the back panel.
After installation of the mains cable connect the unit to mains by inserting the mains plug or making a mains
connection as required by the particular periphery.
6.2.4
Carrying out Setting to Work
After connecting the cooling circuit, filling the coolant container and finishing the electrical connections follow
the steps below for the setting to work for the unit:
1)
Remove the cap on the coolant container.
2)
Switch on the unit and let it run for about 10 minutes in order to fill and vent the cooling circuit.
Continuously check the filling level during this procedure.
Lack of coolant may destroy the pump!
When looking into the filling plug of the coolant container the filling level must always be at least at 2/3 of
the tank height.
3)
If required, refill coolant.
4)
Check the compliance with the operational parameters as specified on page 17.
5)
Remount cap on coolant container.
6)
Switch off the unit.
The unit is ready for operation.
6.3 Daily Start-up
Switch on the unit about 1 minute prior to using the device to be cooled.
6.4 Setting to work after Storage
Setting-to-work after storage will have to follow the same procedures as required for initial operation (see
chapter 6.2).