Laguna Tools Dake SG-75 Скачать руководство пользователя страница 11

 

 

Dake Corporation 

 

 

1809 Industrial Park Dr 

 

Grand Haven, MI 49417 

www.dakecorp.com

 

 

 

961005 

  10 

REV042023 

 

 

INSTALLING/CHANGING BELT  

1.  Make sure machine is not connected to power source.  

2.  Use key to unlock and open belt access door. 

3.  Turn belt tension lock knob counterclockwise to loosen lock 

collar and release belt tension lever. 

4.  Move belt lever down and toward drive motor and release 

belt tension.  

5.  Remove old belt (in installed) and replace with new belt. Be 

sure the new belts arrow matches the direction of rotation of 

the machine. 

6.  Move belt tension lever up and away from drive wheel to 

raise motor and tension the belt.  

7.  Check and adjust belt tracking after installing new belt. See “FISRT RUN” section of this 

manual. 

 

 

CHECKING/ADJUSTING BELT TRACKING 

1.  Make sure machine is not connected to power source.  

2.  Use key to unlock and open belt access door. 

3.  Standing in front of machine rotate either wheel by hand so the belt moves in the direction of 

rotation of the machine (counterclockwise on wheels and towards work rest) 

a.  If belt moves left on wheels (towards motor): Rotate belt adjustment knob 

counterclockwise 1/4 turn. 

b.  If belt moves right on wheels (away from motor): Rotate belt adjustment knob 

clockwise 1/4 turn. 

4.  Repeat step 3 until belt tracks in center of wheels, once done close access door. 
5.  Connect machine to power and verify belt is tracking correctly, fine-tune tracking as 

necessary while machine is running. 

6.   Once tracking is fine-tuned turn the machine OFF and loosen the work rest lock knob to 

adjust to work rest so that there is no more that a 1/16” between the rest and the belt. 

Tighten down lock knob to secure. 

 

 

Содержание Dake SG-75

Страница 1: ...rk Dr Fax 800 846 3253 Grand Haven MI 49417 DAKE STANDING METAL BELT SANDER Model SG 75 INSTRUCTIONAL MANUAL WARNING Read and understand all instructions and responsibilities before operating Failure...

Страница 2: ...TERMS CONDITIONS OF SALE 5 SPECIFICATIONS 6 SAFETY 6 SET UP 8 PLACEMENT 8 ELECTRICAL 9 INSTALLING CHANGING BELT 10 CHECKING ADJUSTING BELT TRACKING 10 FIRST TIME OPERATION 11 CORRECTING PHASE POLARITY...

Страница 3: ...o the repair work completed The standard limited warranty includes repair of the defective component part at no cost to the end user Warranty Process Subject to the conditions hereinafter set forth th...

Страница 4: ...stallation or failure to operate or maintain the unit in accordance with the printed instructions provided c Defects or malfunctions resulting from abuse accident neglect or damage outside of prepaid...

Страница 5: ...ved by Customer Service a representative will supply a Return Material Authorization RMA number The returned item must have the provided RMA number clearly marked on the outside packaging Any item rec...

Страница 6: ...ry may become invalid sixty 60 days after date of quotation Unless otherwise specified in Dake s quotation installation services and final on site adjustments are not included in the quotation TAXES P...

Страница 7: ...5HP Voltage 220V Single Phase Amps 3 9A Belt Included 80 Grit 3 x 79 Belt Speed 5018 FPM Base 16 x 13 Height 42 Weight 117 lbs In the space provided record the serial number and model number of the m...

Страница 8: ...pping and losing control or accidentally contacting cutting tool or moving parts Dust created by machinery operations may cause cancer birth defects eye damage raspatory issues or long term respirator...

Страница 9: ...l laws and legislation for anchoring machinery Anchoring machine to the floor prevents tipping or shifting and reduces vibration that may occur during operation resulting in a machine that runs quiete...

Страница 10: ...ecified circuit requirements Circuit requirements in this manual apply to a dedicated circuit where only one machine will be running on the circuit at a time If machine will be connected to a shared c...

Страница 11: ...al CHECKING ADJUSTING BELT TRACKING 1 Make sure machine is not connected to power source 2 Use key to unlock and open belt access door 3 Standing in front of machine rotate either wheel by hand so the...

Страница 12: ...o CORRECTING PHASE POLARITY section of this manual 3 Ensure motor runs smoothly then activate the E Stop to ensure E Stop is working properly a When E Stop is activated the cover will shut if the cove...

Страница 13: ...rrous metals Zirconia Alumina Finishing wet or dry grinding Ferrous metals some steels Ceramic Aggressing grinding deburring Heat sensitive metals Silicon Carbide Cutting stock removal wet or dry grin...

Страница 14: ...or wiring connections 4 Test for good contacts correct wiring 5 Clean replace belt reduce feed rate grinding depth 6 Clean motor let cool and reduce workload 7 Move machine closer to power supply use...

Страница 15: ...Contact wheel damaged 1 Clean belt and reduce workpiece pressure 2 Keep workpiece moving when grinding 3 Use a finer belt grit 4 Replace contact wheel Snake shaped marks on workpiece 1 Belt loaded up...

Страница 16: ...Dake Corporation 1809 Industrial Park Dr Grand Haven MI 49417 www dakecorp com 961005 15 REV042023 ELECTRICAL DIAGRAM Motor junction box Push button magnetic switch...

Страница 17: ...Dake Corporation 1809 Industrial Park Dr Grand Haven MI 49417 www dakecorp com 961005 16 REV042023 EXPLODED PARTS VIEW...

Страница 18: ...8 Guide Bolt M10 1 5x27mm 42 4 Tap Screw M4 2x19 19 Hex Standoff Male Female M20 1 5x5mm M10 1 5 42 5 Magnet Switch w E Stop Cover 20 Motor 1 1 2HP 220V 3 Phase 42 6 Strain Relief Type 3 M18 1 5 20 1...

Отзывы: