LAGOON 421
7
PLUMBING
75
The port aft toilets are fitted with a soil water tank. The other toilets-
can have them fitted as, optional extra.
Before use ensure that the drain valve on the bowl is closed in order
to avoid any inadvertent discharge (valve is closed when the valve
handle is perpendicular with the pipe).
To empty the tank:
- In an authorized area, open the draining valve.
- In a marina equipped with a system to suck the waste waters, put
the sucking hose into the tank through the deck filler, then start the
suction.
The filler caps are opened and closed with an appropriate key.
When the tank is empty, check the cap seal for condition then close
the filler.
To rinse out the system: Fill the tank with fresh or sea water,then
empty. Only use domestic cleaning products.
The tanks must be empty when the boat is moored in negative tem-
peratures.
WARNING
Ask for information about the laws in force in your country
or your marina about discharging your waste waters into the
sea.
RECOMMENDATION
Use the pump system at ports or marinas to empty the waste
holding tanks.
RECOMMENDATION
For the protection of the environment, do not discharge the
contents of the waste holding tanks near the shore.
PLUMBING
Содержание 421
Страница 1: ...www cata lagoon com LAGOON 421 Owner s Manual...
Страница 2: ......
Страница 6: ......
Страница 10: ...LAGOON 421 NAVIGATION 8 FUEL VALVE located directly on the tanks FUEL VALVE...
Страница 24: ......
Страница 25: ...23 LAYING UP 25 PROTECTION AND MAINTENANCE 25 Winter Storage 2...
Страница 26: ...LAGOON 421 WINTER STORAGE 24 BLOCKING THE BOAT ASHORE...
Страница 28: ......
Страница 29: ...27 RECOMMENDATIONS 29 STEPPING THE MAST 31 Launching 3...
Страница 30: ...LAGOON 421 LAUNCHING 28 POSITIONING OF HOISTING STRAPS...
Страница 34: ...LAGOON 421 LAUNCHING 32 Lay out of Skipper s cabin MAST JUNCTION BOX...
Страница 36: ......
Страница 38: ...LAGOON 421 HULL DECK 36 Wetted area including appendices 63 m CARREENING...
Страница 44: ......
Страница 46: ...LAGOON 421 FITTINGS 44 3 cabin version 4 cabin version FITTINGS...
Страница 54: ......
Страница 64: ...LAGOON 421 ELECTRICITY 62 220V 30A SHORE POWER 30A BREAKER SHORE POWER SUPPLY CIRCUIT BREAKER...
Страница 66: ...LAGOON 421 ELECTRICITY 64 VIEW INTERIOR VIEW OUTSIDE TRANSDUCER LOCATION...
Страница 67: ...65 WATER TANKS 67 FRESH WATER SYSTEM 67 GAS SYSTEM 67 DRAINAGE SYSTEM 71 SANITARY EQUIPMENT 73 Plumbing 7...
Страница 71: ......
Страница 78: ......
Страница 79: ...77 FUEL TANKS 79 FUEL FILTER 81 ENGINES 83 INSTRUMENT PANEL 85 PROPELLERS AND ANODES 85 Engine 8...
Страница 84: ...LAGOON 421 ENGINE 82 ENGINE WATER VALVE ENGINE WATER VALVE...
Страница 86: ...LAGOON 421 ENGINE 84 FUEL VALVE ANODE On hull under water line FUEL VALVE ANODES...
Страница 88: ......
Страница 89: ...87 STANDING RIGGING 91 RUNNING RIGGING 93 WINCHES 93 SAIL SETTING 97 SAILS 99 Rigging and Sails 9...
Страница 90: ...LAGOON 421 RIGGING SAILS 88 SHORT MAST 1 5 2 3 4 STANDING RIGGING...
Страница 92: ...LAGOON 421 RIGGING SAILS 90 LONG MAST LAGOON Lagoon 420 2 50 LAGOON 1 5 4 2 3 STANDING RIGGING...
Страница 98: ......
Страница 102: ......
Страница 104: ...LAGOON 421 SAFETY 102 POSITION OF THE LIFERAFT...
Страница 106: ...LAGOON 421 SAFETY 104 1 Supply valve Gas A diagram enables it to be found easily 2 Gas bottle locker GAS SYSTEM...
Страница 112: ...LAGOON 421 SAFETY 110 ESCAPE EXITS...
Страница 114: ......
Страница 115: ...113 DESIGN CATEGORY 114 GENERAL SPECIFICATIONS 115 General specifications 11...
Страница 120: ......
Страница 121: ......