
L1
L2
L3
N
B A B A B A B A B A B A
• Mount LADEgenius on top-hat rail
• Attach current transformers to main line and connect them to LADEgenius with respect
to the correct phases
• Connect voltage measurement with respect to the correct phases.
• Connect LADEgenius to router or switch via Ethernet; alternatively: install LTE antenna
• Connect power supply
1 – Installing LADEgenius
Main fuse house
connection
The currrent transformer
must be mounted so the
arrow points in the direc-
tion of the current flow
towards
the building.
Data bus (2-wire) to the IO Module.
Up to 16 IO Modules in series possible.
Poled connection.
Note assignment A/B.
Mount current transformer
behind the meter
Up to 6 x 16
charging points
Содержание mini
Страница 1: ...LADEmini Installation Download full manual lade de lademini manual en...
Страница 9: ...N N max 16 A Up to 16 IO Modules charg ing points in series distrib uted over several cabinets...
Страница 16: ...LADE GmbH Wilhelm Maybach Stra e 11 55129 Mainz Germany partner lade de 49 6131 92 66 330 lade de...