![LabRepCo LABH?5?URB Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/labrepco/labh-5-urb/labh-5-urb_owners-manual_3223266005.webp)
5
appliance,
allow
the
cabinet
to
operate
a
minimum
of
four
hours
or
until
it
has
started
cycling
normally
before
placing
product
in
the
cabinet.
The
motor
compressor
may
start
and
stop
several
times
when
the
unit
is
first
started
or
after
defrosting,
especially
if
the
weather
is
very
hot.
This
is
only
normal
functioning
of
the
motor
overload
protector.
The
motor
compressor
will
cycle
normally
as
soon
as
the
excess
heat
has
been
removed.
Shelf
Installation
Hook
shelf
clips
onto
pilaster
strips
(see
Illustration).
Position
all
four
shelf
clips
equal
in
distance
from
the
floor
for
flat
shelves.
Wire
shelves
are
oriented
so
that
cross
support
bars
are
facing
down.
Place
shelves
on
shelf
clips
making
sure
all
corners
are
seated
properly.