background image

Customer’s Address :

 CHAPTER 5.  SERVICE REPORT

Contact Person / Designation :

Tel.No.:

Fax No.:

Weekly Off.:

Dept.:

Date

Nature of Problem :

Observation & Action Taken :

Customer’s Remarks :

Parts Replaced :

Parts Recommended / Action Required : Yes

                     Service Engineer’s Name & Signature

Requisition Number :

Customer’s Name, Signature, Date & Stamp

Page ____ Of ____

No

Model

Serial No.

Date :

Status : OK

Installation

Demonstration

Maintenance

Repairs

Application

Calibration

Validation

Not OK

Warranty

Contract

Billable

Courtesy

SR. No.

System

Configuration

Time

From

To

- 3 -

Содержание LBM-100 D

Страница 1: ...Instruction Manual Please read this manual carefully before using the instrument Labnics Equipment LBM 100 D BIOLOGICAL MICROSCOPE ...

Страница 2: ...instrument These microscope are ruggedly built for classroom and laboratory use The instruments feature fully coated achromatic optics and international standard DIN objectives and eyepieces Optically they are excellent systems with good resolution centering and paragon features Mechanical movements are smooth and positive Mechanical stage and rack stop serve to minimize damage ...

Страница 3: ...ontent Pg No 1 Specification 1 2 Set up 1 2 1 Getting the Microscope Ready For Use 1 2 2 Mounting the Objective and Eyepiece 1 2 3 Illumination 1 3 Operation 2 4 Maintenance 2 5 Service Report 3 Table of Content ...

Страница 4: ...e rotated by hand As you rotate the nosepiece you will notice that each objective lens has a click stop which stops and holds the objective lens being used in its proper position relative to the optical axis of the microscope 2 3 Illumination In order to provide illumination for your new microscope simple plug the power cord into an electrical socket and switch your microscope ON and you are ready...

Страница 5: ...agm attached to the condenser to control the angle of light illumination on the specimen To change the magnification first draw the objective to the position furthest from the stage Then turn the objective turret until the desired objective is in place Return the objective to the point closest to the stage and focus once again backing away from the stage To determine the total magnification multip...

Страница 6: ...rks Parts Replaced Parts Recommended Action Required Yes Service Engineer s Name Signature Requisition Number Customer s Name Signature Date Stamp Page ____ Of ____ No Model Serial No Date Status OK Installation Demonstration Maintenance Repairs Application Calibration Validation Not OK Warranty Contract Billable Courtesy SR No System Configuration Time From To 3 ...

Отзывы: