background image

LAARS HEATING SYSTEMS

Page 6

Boiler Size

Outside Air

Area in Sq. In.*

Inside Air

Area in Sq. In.* (sq cm)

50

15

97

100

645

75

20

129

100

645

100

25

161

100

645

125

32

206

125

807

160

40

258

160

1032

225

60

387

225

1452

*Area indicated is for one of two openings; one at floor level and
one at the ceiling, so the total net free area would be double the
figures indicated. For special conditions, refer to NFPA54 ANSI
Z223.1. In Canada refer to the National Standard CAN1-
B149.1 or .2 which differs from this table.
NOTE: Check with louver manufacturers for Net Free Area of
louvers. Correct for screen resistance to the Net Free Area if a
screen is installed. Check all local codes applicable to
combustion air.

In general, these requirements specify that boiler

rooms which represent confined spaces should be
provided with two permanent air supply openings; one
within 12 inches (305mm) of the ceiling, the other
within 12 inches (305mm) of the floor.

4.

Disconnect the boiler from the gas supply pipe
before pressure testing the pipe for gas leaks.
Provide gas supply pressure to the boiler as
follows:

Inches Water Column

Natural Gas

Propane (LP)

Minimum

5.5

10

Maximum

9

14

NOTE: The boiler and all other gas appliances

sharing the boiler gas supply line must be firing at
maximum capacity to properly measure the inlet
supply pressure. Low gas pressure could be an
indication of an undersize gas meter and/or obstructed
gas supply line.

5.

The correct burner manifold gas pressure is
stamped on the rating plate. The regulator is pre-
set at the factory, and normally requires no
further adjustment.

6.

Before operating the boiler, the complete gas
supply system and all connections must be tested
for leaks using a soap solution.

1G. Combustion Air Supply

The boiler location must provide sufficient

air supply for proper combustion, and ventilation
of the surrounding area as outlined in the latest
edition of ANSI standard Z223.1 or in Canada,
CAN/CGA-B149.1 or .2, and any local codes that
may be applicable.

 Important

See gas line selection chart, Table 4 previous page,
for gas line sizing. In all cases, pipe size is larger
than inlet connection on heater. Run pipe size
shown in chart and reduce at heater inlet.

Table 5. Minimum Recommended

Air Supply to Boiler Room.

Figure 4. Dimensional Information.

Dimensions in inches (mm)

Outside Air Area*

Sq. In.

sq cm

Inside Air Area*

Sq. In.

sq cm

Dimensions

Water

Gas

inches (

mm)

Conn.

Conn.

Size

A

B

C

D

E

V

in.

in.

50

13-3/8

340

27-3/4

705

23-5/8

600

21-3/4

552

26-1/2

673

4

102

1-1/4

1/2

75

13-3/8

340

27-

3/4 705

24-1/8

613

21-3/4

552

27-1/2

699

5

127

1-1/4

1/2

100

16-7/8

429

28-3/4

730

24-1/8

613

22-3/4

578

27-1/2

699

5

127

1-1/4

1/2

125

16-7/8

429

28-3/4

730

23-5/8

600

22-3/4

578

27-1/2

699

6

152

1-1/4

1/2

160

20-3/8

518

28-3/4

730

23-5/8

600

22-3/4

578

27-1/2

699

6

152

1-1/4

1/2

225

25-5/8

651

31-1/2

800

23-1/4

591

23-3/4

629

27-1/2

699

7

178

1-1/4

*

3/4*

*1/2 for propane

Содержание Mini-Therm II JV

Страница 1: ...or explosion may result causing property damage personal injury or loss of life Do not store or use gasoline or other flammable vapors and liquids in the vicinity of this or any other appliance WHAT T...

Страница 2: ...1H Venting 7 1H 1 Common Venting System 8 1I Water Piping of Boiler System 8 1I 1 By pass Piping 8 1J Chilled Water Systems 10 1K Electrical Wiring 10 1L Filling the System 12 SECTION 2 Installation...

Страница 3: ...installation Consult the Laars factory or local factory representative with any problems or questions regarding this equipment Experience has shown that most operating problems are caused by improper...

Страница 4: ...Temperature rise must be measured with the longest highest head zone calling for heat alone Other factors to be considered before selecting a pump are pipe size the number of fittings throughout the s...

Страница 5: ...gas piping from the gas meter to the boiler 3 A trap drip leg must be provided ahead of the gas controls see Figure 4 A manual gas shutoff valve must also be provided for service convenience and safe...

Страница 6: ...an indication of an undersize gas meter and or obstructed gas supply line 5 The correct burner manifold gas pressure is stamped on the rating plate The regulator is pre set at the factory and normally...

Страница 7: ...de with rustproof sheet metal screws IMPORTANT NOTE Do not use sheet metal screws at the snap lock joints of Type B gas vents Do not weld or fasten the vent pipe to the boiler draft diverter The weigh...

Страница 8: ...ate valves at the boiler inlet and outlet so it can be isolated for service Check local codes for specific plumbing requirements before beginning the installation An ASME pressure relief valve is supp...

Страница 9: ...Water Inlet Air Cushion Type Expansion Tank Optional Feed Water Inlet Air Scoop JV Boiler Zone Pumps must be sized properly Flo Checks Flo Checks installed at proper places Bypass Valves Feed Water I...

Страница 10: ...he cooling cycle 1K Electrical Wiring Follow these instructions to make the necessary initial electrical connections 1 Remove the two screws attaching the front cover of the control box 2 There are fo...

Страница 11: ...al Code Part 1 in Canada Do not rely on the gas or water piping to ground the metal parts of the boiler Plastic pipe or dielectric unions may isolate the boiler electrically Service and maintenance pe...

Страница 12: ...lified electrical technician make the necessary measurements to properly set the thermostats 1L Filling the System It is crucial to the efficient operation of the system that all air be removed from t...

Страница 13: ...For primary secondary pumping Connect to W in lieu of A Boiler relay is used for boiler pump and connection to W will energize boiler pump when any zone is calling for heat Wiring with Taco Zone Valv...

Страница 14: ...m pressure with the boiler pressure gauge before beginning regular operation SECTION 2 Operation and Maintenance 2A 1 System Start Up WARNING Do not use this appliance if any part has been under water...

Страница 15: ...n all the way and hold in Immediately light the pilot with a match using the match holder Continue to hold the control knob in for about one 1 minute after the pilot is lit Release knob and it will po...

Страница 16: ...eratures are approximate 2C Maintenance 1 Lubricate the water circulating pump per the instructions on the pump 2 If a strainer is employed in a pressure reducing valve or the piping clean it every si...

Страница 17: ...ge test the circuit between the red wire on the transformer and terminal 4 on the pump relay from terminal 6 on the pump relay and the A connection on the terminal board and from the purple wire termi...

Страница 18: ...oiler of higher input 7 Pump noisy A Air in volute A Bleed air from volute Check pump alignment B Worn coupling or bearings B Replace worn parts 8 Boiler pounding A Too low water flow through boiler A...

Страница 19: ...ble and ground wire Clean flame rod Check electrical connections between flame rod and module Check for cracked ceramic flame rod insulator Check that pilot flame covers flame rod and is steady and bl...

Страница 20: ...or more interconnecting circulating loops each with its own pump Primary System Circuit Secondary Boiler Circuit Reverse return Piping Balanced equal flow first in last out piping Utilized with multip...

Страница 21: ...6601 20036601 20036602 20036602 20036603 20036603 20036604 20036604 Temperature Pressure Gauge A0000100 A0000100 A0000100 A0000100 A0000100 A0000100 A0000100 A0000100 Pressure Relief Valve 30PSI A0069...

Страница 22: ...036700 20036700 20036700 20036700 Terminal Strip E0098500 E0098500 E0098500 E0098500 Hi Tension Lead 10449515 10449516 Blocked Vent Switch E0121000 E0121000 E0121000 E0121000 Roll out Safety Switch E2...

Страница 23: ...Mini Therm II Hydronic Boiler Page 23 Figure13 PartsIdentification Figure 13 Parts Identification...

Страница 24: ...CA 93021 805 529 2000 FAX 805 529 5934 20 Industrial Way Rochester NH 03867 603 335 6300 FAX 603 335 3355 480 S Service Road West Oakville Ontario Canada L6K 2H4 905 844 8233 FAX 905 844 2635 www laar...

Отзывы: