background image

Horizon

Page 3

SECTION 1.

General Information

1A. Freight Claims

Inspection should be made of boiler and

components for damage upon arrival. Any claims for

damage should immediately be filed against the

carrier by the consignee.

1B. General Information

These boilers have been designed and

constructed according to the requirements of the

relevant ASME Codes using heavy gage steel plate

and boiler tubes. They are of the three pass horizontal

tube design using a reverse flame technique in the

boiler to impart a high heat transfer in the primary

heating zone before directing gases into the third pass.

The compact tubular third pass incorporates

special stainless steel flue gas baffles with extension

rods to allow full insertion of the baffles into the back

end of tubes where they are most effective.

A 5 gal/min. domestic hot water coil is located at

the top of the boiler in the hottest zone for ample hot

water supply. A unique feature of its attachment is the

raised coil flange which allows the use of clamping

bolts rather than studs, thereby eliminating water leaks

caused by broken studs.

Two ceraform lined doors provide easy access

for cleaning, the lower door with burner attached

remaining in position while the upper door is removed

for tube cleaning.

A flame observation port is provided for setting-

up burner and a test hole gives access for CO

2

 and

draft readings.

The boiler is encased in a fully insulated baked

enamel jacket and comes completely pre-assembled

for easy installation. Alternatively, it can be supplied

in knock-down form.

Caution

This boiler is designed for use in closed systems
where air is eliminated from the system and no more
oxygen is allowed to enter (typical baseboard or
radiator system). Do not directly connect this boiler
to a system utilizing rubber or plastic tubing which
has an oxygen permeation rating greater than 0.1
milligrams / liter / day. Damage to the boiler will
result and the warranty will be void (see warranty
section 4g).

1C. Boiler Installation

For recommended installation practice reference

should be made to the National Fire Protection

Standard for Oil Burning Equipment - NFPA 31 -

Latest Edition.

1D. Boiler Location

The boiler should be positioned as near to the

chimney as possible and have a minimum smoke-pipe

connector length of 18".

1E. Boiler Clearances (minimum)

Top - 6"; Front - 24"; Rear - 6"; Sides - 6".

1F. Floor

The boiler must be mounted on a non-

combustible masonry or cement floor with no

combustibles underneath.

1G. Combustion and Ventilation Air

To insure an adequate supply of fresh air for

combustion and ventilation an inlet and outlet opening

should be provided at floor and ceiling level. Each

opening must have a minimum of one square inch of

free area for every 1000 BTU/h of input or 140 square

inches per gallon of oil burned per hour. The openings

must not be in a position liable to blockage.

1H. Chimney and Draft Requirements

To assure the safe and proper operation of the oil

burner the boiler must be connected to a chimney

having sufficient draft at all times to evacuate the flue

gases to atmosphere. A draft regulator should be

installed in the smoke-pipe as near to the flue as

possible and adjusted to achieve an over fire draft of

0.01 in. W.C.

1I. Jacket (normally fitted)

If not fitted, assemble panels in accordance with

instructions in Figure 2.

1J. Oil Burner (normally fitted)

If not fitted, insert burner tube into boiler so that

it is recessed approximately 1/4" back from the inside

wall of door insulation, then clamp mounting flange

and bolt up to front-plate.

The burner should be wired and connected to the

oil line in accordance with the manufacturer’s

instructions.

1K. Boiler Controls (normally fitted)

If controls are supplied separately, fit them to the

boiler in the positions shown in Figure 2, with jacket

in place.

Circulator - 1 1/4' return tapping at rear of boiler.

Tridicator - temp./press. gauge - 1/2" tapping at

top of boiler.

Relief Valve - 3/4" tapping at top of boiler. Pipe

to safe place of discharge.

Aquastat Relief - L8124A - 3/4" tapping.

Fit a drain valve (not supplied) in the hydronic

return tee. Check that all connections are made water

tight.

OUT OF

PRODUCTION

Содержание Horizon

Страница 1: ...lue gases which could cause serious injury property damage or death Improper installation and or operation will void the warranty WARNING If the information in this manual is not followed exactly a fi...

Страница 2: ...Draft Requirements 3 1I Jacket normally fitted 3 1J Oil Burner normally fitted 3 1K Boiler Controls normally fitted 3 1L Oil 4 1M Oil Storage and Pipe Layout 4 1N Electrical Connections 4 1O Operatio...

Страница 3: ...ction 4g 1C Boiler Installation For recommended installation practice reference should be made to the National Fire Protection Standard for Oil Burning Equipment NFPA 31 Latest Edition 1D Boiler Locat...

Страница 4: ...onnect pressure relief valve 11 if required by codes maximum 150 PSI as close to the unit as possible No other valves or restrictions may be installed between the DHW coil and the relief valve DO NOT...

Страница 5: ...ise on the most satisfactory method of cleaning or whether a replacement coil is necessary 2E Coil Removal 1 Switch off electrical supply and turn off water to boiler 2 Drain the complete system 3 Dis...

Страница 6: ...me Observation Glass CO2 and Draft Test Plug Flame Retention Oil Burner Glass fiber Rope for positive gas tight seal Flame Reverse Combustion Vent Pipe Hydronic Supply with dip tube Heavy gauge Enamel...

Страница 7: ...ve Fitting Alternate Hydronic Return 1 Figure 3 Supply Pipe Vent Relief Valve Tridicator N P T Aquastat Relay L8124A N P T Wiring Conduit to Circulator Oil Burner Draft Regulator and Smoke Pipe not su...

Страница 8: ...2 84 4 Firing Rate G P H 85 1 1 25 1 50 1 75 2 00 2 25 2 50 Net Stack Temperature 333 371 319 354 325 350 330 360 Water Capaqcity Gal 21 21 34 34 42 42 48 48 Coil Capacity G P M 5 5 5 5 5 5 5 5 Appro...

Страница 9: ...pe System Figure 6 Two Pipe System WARNING The height should not exceed 13 feet WARNING The vacuum must not excedd 11 44 HG 11 44 inches of Mercury Burner is shipped from the factory set up for two pi...

Страница 10: ...g Operation of Boiler and Circulator Power supply provides disconnect means overload protection as required 24V Room Thermostat 1K L1 Hot Power Supply 120V L2 Circulator Switch Low Limit Circulator Hi...

Страница 11: ...ly 145 175 59 090 Burner Door Assembly 145 175 59 136 Flue Cover Assembly 145 175 Part Number Description Size 59 170 Front Panel Assembly 145 175 59 164 Left Panel Assembly 145 175 59 154 Right Panel...

Страница 12: ...Service Advisors 20 Industrial Way Rochester NH 03867 603 335 6300 Fax 603 335 3355 1869 Sismet Road Mississauga Ontario Canada L4W 1W8 905 238 0100 Fax 905 366 0130 www Laars com Litho in U S A Laars...

Отзывы: