L.L.Bean OTNQ5 Скачать руководство пользователя страница 4

4 of 4

6/27/17

Pndt Frmhs Cabinet

STEP 6
Position partially assembled case upright.  Place 2 
Shelves (F) in to the case.  NOTE:  Threaded 
inserts in the shelves should be facing down and 
aligned with the thru holes in the shelf supports on 
the Left and Right Ends inside the case.  Attach the 
Shelves to the Shelf Supports on the Left and Right 
Ends using 4 M6 30MM Bolts (J).  Use Wrench 
(Q) in install and tighten Bolts                                     

At this point tighten all assembly bolts. 

          

STEP 7
Insert 2 M6 * 40MM Bolts (K) in to the threaded 
inserts on the bottom side of top rail on Top (A).  
These are the pivot bolts for the Left & Right 
Doors.

Step 7A

:  Attach Left Door (G) by aligning the 

Hole in top edge of door with the Pivot Bolt on 
undeside of top rail.  Secure the door in place by 
threading 1 M6 * 60MM bolt (L) thru the threaded 
insert in the front bottom rail and in to the hole in 
the bottom edge of Door (G).  Use Wrench (Q) to 
install this bolt.   Thread completely in so that door 
is secure and swings freely. 

Step 7B

: Repeat 7A for the Right Hand Door (H)

Step 7C

: If doors are mis-aligned, you will need to 

level the case.  You can level the case by extending 
necessary levelers (T)  in the bottom of each leg 
until case is level and doors are aligned.   

STEP 8
Attach Metal Knob (M) OR Wood Knob (N), to left 
& right hand doors (G) & (H) using Knob Screw 
(O).

CARE: Clean with mild soap and wipe dry.

www.llbean.com

Product Support 1 800 341 4341

Отзывы: