Rigging procedures
3.
Secure another KS21 on the assembly.
Align the runners with the tracks.
SHLAK!
4.
Repeat until the stack is complete.
Final check
Visually check that no yellow labels are visible.
Manually check that all linking points are secured.
5.
Disengage the brakes and position the stack at its nal position.
6.
Block the stack using both brakes.
KS21 owner's manual (EN) version 2.1
53
Содержание KS21
Страница 1: ...KS21 owner s manual EN ...
Страница 20: ...Rigging system description 20 KS21 owner s manual EN version 2 1 ...